Transportation Improvement Program

Display the search window
Print the report
Print the current page
First Page
Previous Page
v
Next Page
Last Page
Export a report and save it to the disk
Export a report and show it in a new window
v
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2011-2015
Project Name I-65/SR-109 Prop/SR-41 TIP # 2006-416
Improvement Type Interchange Lead Agency TDOT
County Multi-County Length 0.60 Regional Plan ID 1053-240
Air Quality Status Non-Exempt TDOT PIN 107338.00 Project Cost $33,500,000.00
Route I-65/SR-109 Prop/SR-41
Location Proposed SR-109 relocation and new interchange at I-65 and the proposed relocated SR-109
Project Description SR-109 relocation from Vaughn Rd west of I-65 to existing SR-109 east of I-65, new interchange at I-65
and relocated SR-109/Vaughn Rd, & I-65 widening from south of new interchange to near the KY state
line. SR-41 south of proposed SR-109 to near SR-259.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2011 PE-N HPP $25,000.00 $20,000.00 $5,000.00 $0.00
2011 PE-D HPP $30,000.00 $24,000.00 $6,000.00 $0.00
2011 PE-D STP $21,000.00 $16,800.00 $4,200.00 $0.00
2012 ROW NHS $2,333,333.00 $1,866,666.00 $466,667.00 $0.00
2012 ROW, UTILITIES STP $700,000.00 $560,000.00 $140,000.00 $0.00
REVISION HISTORY
9/23/2011 Amend# 2011-021 Project amended to add
additional National Highway
System (NHS) funds for
ROW in FY 2012
7/2/2012 Amend# 2012-055 The amendment added
additional State Surface
Transportation Program
(STP)and National Highway
System (NHS) funding to
fund ROW and Utilities in
fiscal year 2012.
1/17/2013 Amend# 2013-003
Project modified to change
the FY for ROW from 2012
to 2013 and change the
funding code for ROW from
National Highway System
(NHS) to National Highway
Performance Program
(NHPP) to reflect new codes
part of the MAP-21
transportation bill.  The total
project cost remains the
same.
PROJECT NOTES
Nashville Area Metropolitan Planning Organization Transportation Improvement Program for FYs 2011-2015
Printed on Tuesday, April 23, 2024 Page 1/2