Transportation Improvement Program

Display the search window
Print the report
Print the current page
First Page
Previous Page
v
Next Page
Last Page
Export a report and save it to the disk
Export a report and show it in a new window
v
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2011-2015
Project Name Positive Train Control Technology TIP # 2013-89-205
Improvement Type Transit Capital Lead Agency RTA
County Multi-County Length 32.00 Regional Plan ID Consistent
Air Quality Status Exempt TDOT PIN Project Cost $750,000.00
Route Positive Train Control Technology
Location Music City Star rail line between Lebanon and Nashville
Project Description Study, procurement and installation of Positive Train Control technology along RTA’s Music City Star line
and any future rail lines.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2013 IMPLEMENTATION FTA 5307 $750,000.00 $600,000.00 $75,000.00 $75,000.00
REVISION HISTORY
4/12/2013 Amend# 2013-007 Project amended into the TIP
with $600,000 (federal
share) in FTA 5307 funds
being programmed for this
project. The funds for this
project come from FTA’s FY
2013 apportionment of 5307
funds for the Nashville-
Davidson Urbanized Area.
PROJECT NOTES
In September 2008, Congress passed a new rail safety law
that sets a deadline of December 15, 2015, for implementation
of positive train control (PTC) technology across most of the
U.S. rail network. Positive Train Control technology will be
used over all existing rail and will be implemented on all future
RTA rail lines. The major tasks may include a study by an
independent consultant to determine how RTA will implement
PTC as well as the actual procurement and installation of
equipment along the rail lines and on the locomotive itself.
Nashville Area Metropolitan Planning Organization Transportation Improvement Program for FYs 2011-2015
Printed on Friday, December 27, 2024 Page 1/1