Transportation Improvement Program

Display the search window
Print the report
Print the current page
First Page
Previous Page
v
Next Page
Last Page
Export a report and save it to the disk
Export a report and show it in a new window
v
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2011-2015
Project Name SR-171 (Mt. Juliet Road) Traffic Adaptive
Signal Control System Corridor
Optimization Project
TIP # 2013-77-218
Improvement Type ITS Lead Agency Mt. Juliet
County Wilson County Length 1.30 Regional Plan ID 1087-701
Air Quality Status Exempt TDOT PIN Project Cost $653,000.00
Route SR-171/Mt. Juliet Rd
Location SR-171/Mt. Juliet Rd from Graves Crossing to Pleasant Grove Rd.
Project Description Implementation of a fully-functioning, reliable adaptive signal control system through the installation of a
master signal controller, wireless communication devices, and radar detection for both vehicular and
bicycle (self-propelled) traffic.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2013 PE-D U-STP $68,000.00 $0.00 $0.00 $68,000.00
2014 CONSTRUCTION U-STP $585,000.00 $468,000.00 $0.00 $117,000.00
REVISION HISTORY
5/2/2013 Amend# 2013-025
The amendment adds the
project to the TIP with
$468,000 (federal share) in
U-STP funds in FY 2014.
The funds were awarded
through the MPO’s ITS/
System Operations Program
competition. Funds for this
project are being shifted from
TIP project #2011-89-9999 -
Regional ITS & System
Management Projects with U
-STP.
PROJECT NOTES
Nashville Area Metropolitan Planning Organization Transportation Improvement Program for FYs 2011-2015
Printed on Friday, April 26, 2024 Page 1/1