1/8/13 -The project is currently scheduled to be advertised in
				 
				
					
						April 2014 and will be included in the May 2014 TDOT contract
				 
				
					
						letting. Construction could begin as early as June 2014,
				 
				
					
						following the review and approval of the bid documents and
				 
				
					
						issuance of a notice to proceed to the contractor. Construction
				 
				
					
						of the project is anticipated to take 12 months, and will be in
				 
				
					
						accordance with the latestedition of TDOT’s Standard
				 
				
					
						Specifications for Road and Bridge Construction. TDOT will
				 
				
					
						provide full construction engineering and inspection services,
				 
				
					
						which will include regular coordination meetings with the
				 
				
					
						contractor to ensure that the project remains on schedule and
				 
				
					
						is completed by the contract date. The lead agency for this
				 
				
					
						project application is the City of Oak Hill. The City of Oak Hill
				 
				
					
						has a small full time staff and does not have afull time
				 
				
					
						professional engineer on staff. Therefore, when the funds were
				 
				
					
						awarded for the preliminary engineering and right of way for
				 
				
					
						this project, Oak Hill reached out and requested that TDOT
				 
				
					
						administer and manage the project. TDOT agreed and is
				 
				
					
						currently administering the project through the Design Division.
				 
				
					
						TDOT has hired Kimley‐Horn and Associates, Inc. through
				 
				
					
						one of their on‐call contracts for the Survey, Preliminary
				 
				
					
						Engineering, and Final Design of the Construction Documents.
				 
				
					
						TDOT will administer and manage the construction of the