NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Name SR-106 (Hillsboro Rd ) and SR-46 Re-
alignment/ Signalization.
TIP # 2008-64-037
Improvement Type Intersection Lead Agency Williamson County
County Williamson County Length 0.10 Regional Plan ID 1064-252
Air Quality Status Exempt TDOT PIN 107914.00 Project Cost $1,235,000.00
Route SR-106 (Hillsboro Rd)/ SR-46
Location SR-46 (Old Hillsboro Rd)/ SR-46
Project Description Realign intersection to create a 90 degree alignment, with turn lanes of appropriate stacking length on
both roadways. Relocate existing signal.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2014 PE-D U-STP $30,000.00 $24,000.00 $6,000.00 $0.00
2014 ROW U-STP $35,000.00 $28,000.00 $7,000.00 $0.00
2015 CONSTRUCTION U-RSV $1,028,000.00 $822,400.00 $205,600.00 $0.00
2015 PE-D, ROW U-STP $22,000.00 $17,600.00 $4,400.00 $0.00
2016 PE-N U-STP $120,000.00 $96,000.00 $24,000.00 $0.00
REVISION HISTORY
3/12/2016 Amend# 2016-017 This project is being adjusted
to shift $60,000 (federal)
from the PE-D phase to the
PE-N phase in order to cover
an increase in PE-N costs
due to necessary geotech
work completed on the
project.
PROJECT NOTES
12/18/12-Once the engineering phase is complete (see 2011-
2014 TIP), a truer picture of the project scope will be known.
However, based on the above noted TPR, a new alignment for
SR-46 is to be constructed to provide a skew of 90 degrees.
This alignment is to be located in the ROW previously acquired
by Williamson County. This new section of roadway would
include two 12' left and right turn lanes in addition to 6' paved
shoulder. On SR-1 06, a new 12' left tum lane is to be
constructed, as well as anew 12' right tum lane (south
approach). It is intended that intersection signalization be
actuated with two phase operation due to the relatively low
volumes on SR-46.Major Tasks/Activities- assuming
completion of the engineering phase in FY-13, ROW phase
should begin in FY14, and construction in FY-15.Schedule-
assuming completion of the engineering phase previous
funded in FY 2011-14TIP in FY-13, ROW acquisition (if
necessary) would commence in FY-14, and actualconstruction
in FY -15.• Milestones, et al- Williamson County Government
has successfully managed a number of similar projects,
including signalization at SR-106 and Murray Lane, SR-1 06
and Sneed Road (including left tum lane), SR 106 and Berrys
Chapel Road, SR 106 and Battlewood Court, SR46 and SR-
96, and SR-106 and Manley Lane. These projects were
developed and implemented from 1994 through 2009.