Transportation Improvement Program

Display the search window
Print the report
Print the current page
First Page
Previous Page
v
Next Page
Last Page
Export a report and save it to the disk
Export a report and show it in a new window
v
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Name Battery Lane / Harding Place at Franklin
Road Improvements
TIP # 2011-14-042
Improvement Type Intersection Lead Agency Oak Hill
County Davidson County Length 0.70 Regional Plan ID 1014-259
Air Quality Status Non-Exempt TDOT PIN 116103.00 Project Cost $1,810,000.00
Route Battery Lane / Harding Place at Franklin Road Improvements
Location State Route 6 (Franklin Road) at State Route 255 (Harding Place) and Battery Lane
Project Description Capacity improvements for the eastbound, westbound, and southbound approaches to the intersection
consisting of lane additions, lane extensions, and lane widening to meet current standards and current
traffic demands.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2014 PE-D U-STP $42,500.00 $34,000.00 $8,500.00 $0.00
2015 ROW U-STP $800,000.00 $640,000.00 $160,000.00 $0.00
2015 CONSTRUCTION U-STP $800,000.00 $640,000.00 $160,000.00 $0.00
REVISION HISTORY
3/10/2015 Amend# 2015-011 This project is being adjusted
to shift funds from the
CONST line into the ROW
line to aid in covering an
unanticpated increase in
ROW costs. The funds are
also being brought forward
into FY 15 in order to allow
these changes.
PROJECT NOTES
1/8/13 -The project is currently scheduled to be advertised in
April 2014 and will be included in the May 2014 TDOT contract
letting. Construction could begin as early as June 2014,
following the review and approval of the bid documents and
issuance of a notice to proceed to the contractor. Construction
of the project is anticipated to take 12 months, and will be in
accordance with the latestedition of TDOT’s Standard
Specifications for Road and Bridge Construction. TDOT will
provide full construction engineering and inspection services,
which will include regular coordination meetings with the
contractor to ensure that the project remains on schedule and
is completed by the contract date. The lead agency for this
project application is the City of Oak Hill. The City of Oak Hill
has a small full time staff and does not have afull time
professional engineer on staff. Therefore, when the funds were
awarded for the preliminary engineering and right of way for
this project, Oak Hill reached out and requested that TDOT
administer and manage the project. TDOT agreed and is
currently administering the project through the Design Division.
TDOT has hired Kimley‐Horn and Associates, Inc. through
one of their on‐call contracts for the Survey, Preliminary
Engineering, and Final Design of the Construction Documents.
TDOT will administer and manage the construction of the
project as well.
Nashville Area Metropolitan Planning Organization Transportation Improvement Program for FYs 2014-2017
Printed on Friday, April 19, 2024 Page 1/2