NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Name Complete Streets Implementation on BRT
Lite Corridors - Gallatin Pike
TIP # 2014-111-026
Improvement Type Multi-Modal Upgrades Lead Agency Metro Nashville
County Davidson County Length 0.00 Regional Plan ID Consistent
Air Quality Status Exempt TDOT PIN Project Cost $5,383,360.00
Route
Location Alta Loma Road to Liberty Lane
Project Description Implementation of Complete Streets elements along the Gallatin Pike BRT lite corridor in Nashville.  Work
elements may include a multi-use path, strategic pedestrian connections, improved signalized
intersections with crosswalks and pedestrian countdown timers, reconfigured or repositioned transit
stations,  enhanced transit station amenities, bike lockers and benches. Project must be designed in
coordination with a steering committee comprised, at a minimum, of represenatives from Metro Planning,
Nashville MTA, and the MPO.
Fiscal Year Type of Work Funding Type Total Funds Federal Funds State Funds Local funds
2017 PE-N U-STP $300,000.00 $240,000.00 $0.00 $60,000.00
2017 PE-D U-STP $506,000.00 $404,800.00 $0.00 $101,200.00
2017 ROW,
CONSTRUCTION
U-STP $3,846,800.00 $3,077,440.00 $0.00 $769,360.00
REVISION HISTORY
10/26/2016 Amend# 2017-002 This project was adjusted to
to better define phases of
work and funding for each.
Additionally, local matching
funds have been corrected to
display a proper 20% local
match for each phase. There
is no change in the federal
share of the project cost at
this time.
PROJECT NOTES
12/18/12 - Metro project in coordination with MTA