TIP Project #2022-76-135: Mt. Juliet Road (SR-171) ADA Upgrades – Phase 2

This project will replace existing sidewalks along Mt. Juliet Road (SR-171) with 6 foot wide ADA compliant infrastructure and enhance pedestrian safety through crossing improvements at unsignalized intersections and driveways.

M Multi-Modal Upgrades Regional Plan ID: Multimodal
Mt. Juliet TDOT PIN: 132345.00
Wilson County Total Cost: $1,468,640.00
Mt. Juliet Rd (SR-171) Total Programmed: $1,382,640.00
Weston Dr to Old Lebanon Dirt Rd Federal Share: $1,066,111.60
0.42 miles Federal Obligation*: $61,800.00
Exempt Unobligated Balance: $1,004,311.60
* Obligations during current TIP period only.

Programmed Funds

Fiscal YearPhaseFunding SourceTotal FundsFederal FundsState FundsLocal Funds
2025PE-D, ROW, CONSTRUCTIONSTBG-U$741,157.00$592,925.60$0.00$148,231.40
2026CONSTRUCTIONLOCAL$50,000.00$0.00$0.00$50,000.00
2026CONSTRUCTIONTAP-U$591,483.00$473,186.00$0.00$118,297.00
TOTAL  $1,382,640.00$1,066,111.60$0.00$316,528.40

Construction Reserve Funds

There is no reserve funding information for this TIP Project.

Obligated Funds

Obligation DatePhaseFunding SourceFederal FundsNotes
12/15/2022PE-NCRRSAA-U$21,000.00ADJUST
2/14/2024PE-DSTBG-U$40,800.00AUTHORIZE
TOTAL  $61,800.00 

Project Images and Videos

2022-76-135_Image

Project Documents and Links

There are no documents or links for this TIP Project.

Project Notes

NotePosted On
This project was approved by TDOT as a TIP adjustment. 12/27/2023

Project Amendments

Amendment #ActionMPO ApprovalTDOT ApprovalUS DOT Approval
2024-003This amendment adds $592,926 in federal U-STBG funds to the project to replace U-CRRSAA funds that were previously shifted to TIP #s 2022-89-145 and 2016-84-231.11/15/202312/19/202312/19/2023
2025-051This amendment will add a local funding source line for Construction to cover cost overruns. The amount of local funds for construction to be added is $355,000.9/17/20251/08/2026 

Administrative Modifications

Adjustment #ActionMPO Approval
2026-011Mod 806: Adds $473,186 in federal TAP funds ($591,483 total) shifted from TIP ID #2023-86-6666 and reduces local CONS funds to $50,000. Total cost is updated to $1,468,640.5/06/2026

Submit a Comment

The Nashville Metropolitan Planning Organization welcomes your feedback. Please enter your comment below and click Submit. While we review all comments carefully, we are not able to respond to every comment.

Your name:*
Phone #:
Email address:

Your comment:

Please limit your comment to 2,000 characters.