TIP Project #2023-89-120: Surface Transportation Block Grant Program (STBG) Grouping

Projects and programs for the preservation and improvement of the conditions and performance of Federal-aid highways and public roads, including: Rehabilitation, resurfacing, restoration, preservation, and operational improvements on Federal-aid highways and designated routes of the Appalachian Development Highway System (ADHS) and local access roads under 40 USC 14501; Traffic operations on Federal-aid highways; Bridge and tunnel improvements on public roads; Safety improvements on public roads; Environmental mitigation; Scenic and historic highway programs; Landscaping and scenic beautification; Historic preservation; On- and off-road pedestrian and bicycle facilities; Infrastructure projects for improving non-driver access to public transportation and enhanced mobility; Community improvement activities; Recreational Trail Program projects; Safe Routes to School (SRTS) projects,; Transportation Enhancement projects; Transportation Alternatives projects; Projects for the creation, rehabilitation, and maintenance of multi-use recreational trails; Projects for the planning, design or construction of boulevards and other roadways largely in the right-of-way of former Interstate System routes or other divided highways. Please refer to Appendix G of the TIP document for more information about and work allowable from this grouping.

M Road Upgrades Regional Plan ID: Preservation
TDOT TDOT PIN: 126761.00
Multi-County Total Cost: $52,839,000.00
Surface Transportation Block Grant Program (STBG) Grouping Total Programmed: $77,839,000.00
Regionwide - Nashville Area MPO Federal Share: $62,271,200.00
0.00 miles Federal Obligation*: $42,972,886.66
Exempt Unobligated Balance: $19,298,313.34
* Obligations during current TIP period only.

Programmed Funds

Fiscal YearPhaseFunding SourceTotal FundsFederal FundsState FundsLocal Funds
2023PE-N, PE-D, ROW, CONSTRUCTIONSTBG$13,335,600.00$10,668,480.00$2,667,120.00$0.00
2024PE-N, PE-D, ROW, CONSTRUCTIONSTBG$11,668,650.00$9,334,920.00$2,333,730.00$0.00
2025PE-N, PE-D, ROW, CONSTRUCTIONHIP$4,500,000.00$3,600,000.00$900,000.00$0.00
2025PE-N, PE-D, ROW, CONSTRUCTIONSTBG$21,667,800.00$17,334,240.00$4,333,560.00$0.00
2026PE-N, PE-D, ROW, CONSTRUCTIONSTBG$26,666,950.00$21,333,560.00$5,333,390.00$0.00
TOTAL  $77,839,000.00$62,271,200.00$15,567,800.00$0.00

Construction Reserve Funds

There is no reserve funding information for this TIP Project.

Obligated Funds

Obligation DatePhaseFunding SourceFederal FundsNotes
8/23/2023PE-DSTBG$80,000.00AUTHORIZE
9/5/2023CONSTRUCTIONHIP$4,357,725.00AUTHORIZE
12/11/2023PE-NSTBG$56,000.00ADJUST
12/11/2023CONSTRUCTIONHIP$353,321.00AUTHORIZE
1/3/2024CONSTRUCTIONSTBG$1,658,312.00AUTHORIZE
1/3/2024CONSTRUCTIONSTBG$763,928.00AUTHORIZE
1/3/2024CONSTRUCTIONSTBG$673,640.00AUTHORIZE
1/3/2024CONSTRUCTIONSTBG$481,520.00AUTHORIZE
2/14/2024CONSTRUCTIONSTBG$1,445,768.00AUTHORIZE
2/27/2024PE-NSTBG$1,174,388.00AUTHORIZE
3/20/2024PE-NSTBG$420,700.00AUTHORIZE
3/20/2024PE-NSTBG$233,100.00AUTHORIZE
5/9/2024CONSTRUCTIONSTBG$297,917.00ADJUST
5/9/2024CONSTRUCTIONSTBG$922,672.00AUTHORIZE
5/9/2024CONSTRUCTIONSTBG$447,664.00AUTHORIZE
5/14/2024CONSTRUCTIONSTBG$3,231,760.00AUTHORIZE
6/21/2024PE-NSTBG$1,342,156.00ADJUST
9/16/2024CONSTRUCTIONSTBG$2,712,000.00CONVERT AC
9/19/2024CONSTRUCTIONSTBG-U$3,356,856.00AUTHORIZE
10/30/2024CONSTRUCTIONSTBG$1,471,408.00AUTHORIZE
11/4/2024CONSTRUCTIONSTBG$27,088.00ADJUST
11/4/2024CONSTRUCTIONSTBG$212,432.00AUTHORIZE
11/4/2024CONSTRUCTIONSTBG$400,792.00AUTHORIZE
11/4/2024CONSTRUCTIONSTBG$682,912.00AUTHORIZE
12/23/2024CONSTRUCTIONSTBG$766,208.00AUTHORIZE
1/3/2025CONSTRUCTIONSTBG$1,767,328.00AUTHORIZE
1/8/2025CONSTRUCTIONSTBG$1,328,168.00AUTHORIZE
1/8/2025CONSTRUCTIONSTBG$2,095,960.00AUTHORIZE
2/21/2025PE-NSTBG$48,000.00AUTHORIZE
4/4/2025PE-N; PE-D; CONSTRUCTIONSTBG$2,126,799.00ADJUST
4/4/2025PE-N; ROW; CONSTRUCTIONSTBG$1,076,532.66ADJUST
4/9/2025PE-NSTBG$32,000.00AUTHORIZE
4/9/2025PE-NSTBG$36,000.00AUTHORIZE
4/29/2025PE-NSTBG$256,000.00AUTHORIZE
5/7/2025CONSTRUCTIONSTBG$1,513,216.00ADJUST
5/19/2025CONSTRUCTIONSTBG$124,816.00AUTHORIZE
8/8/2025PE-NHIP$140,000.00AUTHORIZE
8/27/2025CONSTRUCTIONSTBG$980,728.00AUTHORIZE
9/3/2025PE-N; PE-DSTBG$84,640.00ADJUST
9/3/2025ROWHIP$899,882.00AUTHORIZE
9/15/2025CONSTRUCTIONSTBG$67,348.00ADJUST
9/15/2025PE-N; PE-D; ROWHIP$2,825,202.00ADJUST
TOTAL  $42,972,886.66 

Project Images and Videos

 There are no images for this TIP Project.

Project Documents and Links

There are no documents or links for this TIP Project.

Project Notes

There are no notes for this TIP Project.

Project Amendments

There are no amendments for this TIP Project.

Administrative Modifications

Adjustment #ActionMPO Approval
2025-006This modification adds a total of $15 Million dollars ($12,000,000 Federal STBG funds) to the FY 25 programming line.3/04/2025
2025-012This modification adds a new line of 2025 PE-N/PE-D/ROW/CONST with HIP Funding totaling $2.5 million dollars.8/07/2025
2025-014This modification revises FY 2025 HIP from $2,500,000 to $4,500,000, $3,600,000 federal, $900,000 state.Total project cost increases from $50,839,000 to $52,839,000.9/10/2025
2026-004This modification adds a total of $25 Million dollars ($20,000,000 Federal STBG funds) to the FY 26 programming line.12/23/2025

Submit a Comment

The Nashville Metropolitan Planning Organization welcomes your feedback. Please enter your comment below and click Submit. While we review all comments carefully, we are not able to respond to every comment.

Your name:*
Phone #:
Email address:

Your comment:

Please limit your comment to 2,000 characters.