| 2024-004 | This project has been modified as a correction to add $20,000 in federal CMAQ funds to the FY 2024 construction phase, remove the implementation line, and shift the required match from local to state match as a result of TIP Adjustment #2019-037 from the FYs 2017-2020 TIP. This modification also updates the total project cost and adds a 2024 Local line. | 1/05/2024 |
| 2024-024 | This project has been modified to shift $136,576 from the FY 2024 PE-D/Construction line to the FY 2024 Construction line and add $27,091 in LOCAL funds. | 5/15/2024 |