Proposed Amendment (revision)
|
This project involves traffic signal infrastructure upgrades and signal coordination along three major corridors in Goodlettsville: Long Hollow Pk (SR-174), Conference Dr, and Main St (SR-11/US31W/US41). Improvements will include the installation of traffic adaptive technology, including video detection, new mast arms, new signals, flashing yellow arrows, new signal control cabinets, wireless communications, and ADA improvements.
|
| Type:
|
M ITS
|
Regional Plan ID:
|
Congestion Management
|
| Lead Agency
|
Goodlettsville
|
TDOT PIN:
|
130749.00
|
| County
|
Davidson County
|
Total Cost:
|
$3,839,416.00
|
| Name/Route:
|
along Long Hollow Pk (SR-174), Conference Dr, and Main St (SR-11/US31W/US41)
|
Total Programmed:
|
$3,658,416.00
|
| Location:
|
along Long Hollow Pk (SR-174), Conference Dr, and Main St (SR-11/US31W/US41)
|
Federal Share:
|
$3,555,416.00
|
| Length:
|
3.72 miles
|
Federal Obligation*:
|
$280,000.00
|
| Air Quality Status:
|
Exempt
|
Unobligated Balance:
|
$3,275,416.00
|
|
|
|
|
<< BACK
|
Project in
Transportation Improvement Program for FYs 2023-2026
|
|
|
Programmed Funds
| 2023 | PE-D | CMAQ | $100,000.00 | $100,000.00 | $0.00 | $0.00 |
| 2025 | PE-D | CMAQ | $180,000.00 | $180,000.00 | $0.00 | $0.00 |
| 2026 | CONSTRUCTION | CMAQ | $2,863,416.00 | $2,863,416.00 | $0.00 | $0.00 |
| 2026 | CONSTRUCTION | U-TAP | $515,000.00 | $412,000.00 | $0.00 | $103,000.00 |
| TOTAL | | | $3,658,416.00 | $3,555,416.00 | $0.00 | $103,000.00 |
Construction Reserve Funds
|
There is no reserve funding information for this TIP Project.
|
Obligated Funds
| 1/24/2023 | PE-D | CMAQ | $100,000.00 | AUTHORIZE |
| 9/10/2025 | PE-D | CMAQ | $180,000.00 | ADJUST |
| TOTAL | | | $280,000.00 | |
Project Images and Videos
Project Documents and Links
| There are no documents or links for this TIP Project. |
Project Notes
| This amendment replaces the FY 25 LOCAL line of $421,416 with an equivalent amount of FY 25 CMAQ funds from the TDOT Air Quality program and combines CMAQ Construction lines into FY 2026. | 11/06/2025 |
| This amendment replaces the FY 25 LOCAL line of $421,416 with an equivalent amount of FY 25 CMAQ funds from the TDOT Air Quality program. | 10/29/2025 |
| This amendment shifts $412,000 of federal U-TAP funds from TIP#2023-86-6666 for FY 25 construction and adds a FY 25 LOCAL line to account for increased project costs. | 7/07/2025 |
Proposed Amendment (revision)