This amendment revised the project’s scope to prioritize the ADA improvements, with a future project addressing the substandard sidewalk width and existing gaps. Additionally the project’s LOCAL funding line is being removed to account for the reduced project cost due to the scope reduction. | 7/07/2025 |
This amendment adds $ 896,224 in federal U-STBG funds for FY 2024 PE-N/PE-D/ROW/CONST to replace U-CRRSAA funds that were previously shifted to TIP #s 2022-89-145 and 2016-84-231. | 4/25/2024 |
This project was modified in the FYs 2020-2023 TIP to remove $1,120,280 U-CRRSAA funding for PE, ROW, and CONSTRUCTION in FY 2022. | 10/25/2023 |