The East-West Corridor project will widen existing roadway to five lanes with curb and gutter between Blythe Avenue and North Water Avenue. Construct new (2-lane, divided median with turn lanes or 3-lane cross section) roadway connection between Blythe Avenue and SR-109. Acquire right of way for a 5-lane minor arterial (including sidewalks) along the entire route between US-31E and SR-109. Acquire right of way at the intersection of SR-109 and Hatten Track Road to allow for a future interchange at this location.