2014 | PE, ROW, CONSTRUCTION | SRTS | $144,939.00 | $144,939.00 | $0.00 | $0.00 |
2015 | PE-D, ROW, CONSTRUCTION, PE-N | L-STP | $101,780.00 | $81,424.00 | $0.00 | $20,356.00 |
2016 | PE, ROW, CONSTRUCTION | L-STP | $123,349.00 | $98,679.00 | $0.00 | $24,670.00 |
TOTAL | | | $370,068.00 | $325,042.00 | $0.00 | $45,026.00 |