2016-019 | 2004-051 | SR-247 (Duplex Road) Widening | This amendment adds $13,856,880 (federal) in State STP funds to the project in FY 2017 for construction. | 6/15/2016 | | |
2014-011 | 2008-15-048 | Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational software | This amendment adds $340,480 (federal) in FTA 5307 funds to FY 2014. The additional funds for this project are a combination of unobligated funds from FY 2013 and funds being shifted from TIP # 2008-15-046. | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2014-028 | 2008-15-048 | Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational software | This amendment adds $377,529 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment. | 9/17/2014 | | |
2015-028 | 2008-15-049 | MTA - Administration Building Rehabilitation (Nestor) | This project has been amended to advance the project schedule and add $3,196,000 (federal) in FYs 2014 and 2015 FTA 5307 funds shifted to the project from TIP# 2008-17-021. Projected FY 2017 funding amounts have been dropped from the project. | 6/17/2015 | | |
2014-001 | 2014-76-017 | Town Center Trail | This amendment combines Phases II and III of the project and adds $827,064 (federal) in CMAQ funds from a previous CMAQ award that was not programmed into the FYs 2014-2017 TIP prior to its adoption. | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2014-015 | 2009-72-035 | SR-109 Reconstruction & Widening | An additional $9,760,000 (federal) in National Highway Performance Program funds is being added to the project. | 6/18/2014 | 7/01/2014 | 7/16/2014 |
2015-047 | 2009-85-012 | Express Bus Service from Williamson County | RTA was awarded $763,200 (federal) for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project. | 9/16/2015 | | |
2014-002 | 2011-54-156 | Tyree Springs (SR-258) / S Palmers Chapel Intersection Improvements | This amendment adds $270,457 in State Safety funds to match the approved contract with TDOT. | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2015-005 | 2011-85-125 | Expansion of Regional Bus Services | This project was amended by resolution of the MPO Executive Board on 12/10/14 to add $274,758 (federal) in CMAQ funds awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2014-025 | 2011-610-165 | Fairview 3R Improvement Projects Grouping | The City of Fairview is requesting that a previously unprogrammed $300,000 (federal) in local Surface Transportation Program (L-STP) funding be added to fiscal year 2014. | 6/18/2014 | | 7/16/2014 |
2015-045 | 2012-15-179 | Express Bus Service to Madison | MTA was awarded $1,113,000 (federal) in CMAQ funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project. | 9/16/2015 | | |
2015-050 | 2012-85-180 | NE Corridor Regional Express Bus Service | RTA was awarded $763,200 (federal) for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project. | 9/16/2015 | | |
2014-030 | 2014-85-012 | Purchase and/or rehab Locomotive and rail cars | This amendment adds $2,401,787.00 (federal share) in FTA 5337 funds to TIP #2014-85-012 in FY 2014. These are new formula funds from the State of Good Repair Program apportioned in February 2014 to the Nashville-Davidson Urbanized Area. The State of Good Repair (SGR) program provides capital assistance for maintenance, rehabilitation, and replacement projects for existing fixed guideway and high intensity motorbus systems. | 9/17/2014 | | |
2015-023 | 2014-85-014 | Regional Park & Ride | This amendment shifts $150,000 (federal) in FY14 FTA 5307 funds to a new project for Williamson County/TMA Group (TIP # 2015-65-075). | 3/18/2015 | | |
2015-022 | 2014-85-015 | Vanpool Vehicle Replacements | This amendment shifts $436,480 (federal) in FY14 FTA 5307 funds to a new project for Williamson County/TMA Group (TIP # 2015-65-075). | 3/18/2015 | | |
2015-026 | 2014-86-6666 | MPO Active Transportation Program | This amendment shifts $17,380 (federal) in U-STP funds to a new project for TDOT (TIP# 2015-87-077). | 3/18/2015 | | |
2015-019 | 2014-86-6666 | MPO Active Transportation Program | This project was amended by resolution of the MPO Executive Board on 12/10/14. It shifts $4,280,043 (federal) in U-STP funds and $5,330,348 (federal) in U-ALT funds to various new projects awarded by the MPO's Active Transportation Program in 2014. | 12/10/2014 | | |
2016-015 | 2014-89-9999 | MPO ITS/Ops Program | This amendment shifts $192,000 (federal) to TIP# 2013-77-218 in order to cover project cost overruns and bring the project to completion. | 6/15/2016 | | |
2014-029 | 2014-85-023 | Music City Star Miscellaneous Support Equipment & Passenger Amenities | This amendment adds $54,182 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment. | 9/17/2014 | | |
2014-017 | 2014-18-045 | I-65/ I-40 Bridge Rehabilitation | This project is amended to add $44,100,000 (federal) in NHPP funding to fiscal year 2014 in the form of an additional phase for Construction. The total project cost was increased accordingly. | 6/18/2014 | 7/01/2014 | 7/16/2014 |
2016-014 | 2013-77-218 | SR-171 (Mt. Juliet Road) Traffic Adaptive Signal Control System Corridor Optimization Project | This amendment adds $192,000 (federal) to this project from a bucket of funding identified in TIP# 2014-89-9999 for ITS projects and projects that improve the operations of the regional system without adding capacity. The City of Mt. Juliet has been pursuing an adaptive signal system. Upon bidding the construction portion of the project, the City found that previous estimates were insufficient and is revising project cost utilizing this available funding based on updated bids. | 6/15/2016 | | |
2015-002 | 2014-85-028 | Bus & Bus Facilities (Grouping) - Nashville-Davidson UZA | This project was amended by resolution of the MPO Executive Board on 12/10/14. $65,000 (federal) in FTA 5339 funds were shifted from FY 2014 into a new project for the Franklin Transit Authority (TIP #2015-65-060). | 12/10/2014 | | |
2016-021 | 2014-310-041 | Springfield 3R Improvements Program (Grouping) | This project was amended to add $199,928 (federal) to this project in FY16. These funds were allocated to the City of Springfield by TDOT through its Small Cities STP Allocation Program. They are FY 2015 funds that were allocated a year behind the normal timeframe due to the absence of a long term federal transportation bill. | 9/21/2016 | | |
2014-027 | 2014-36-042 | Springfield Greenway - Phase 3 | This amendment makes several updates to the existing project in the TIP. The project title is being altered to better identify the project and the project description has also been updated accordingly. Funds on the previous TIP page were incorrectly identified as ENH funds. They have been corrected to HPP funds and new HPP and TAP funds awarded to the project have been added as shown. | 9/17/2014 | | |
2014-003 | 2004-022 | SR-76 Sidewalks | Project added to the FY 2014-2017 TIP with $149,024 (federal) | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2014-004 | 2006-117 | Hillsboro Road (SR-106/US-431) Widening | This amendment adds the project to the FY 2014-2017 TIP with $500,000 (federal) | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2014-005 | 2014-66-053 | Nolensville Elementary School | This amendment adds the project to the FY 2014-2017 TIP with $101,250 (federal) | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2014-006 | 2014-56-054 | Watt Hardison Elementary School | This amendment adds the project to the FY 2014-2017 TIP with $208,166 (federal) | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2014-008 | 2014-85-055 | RTA Operations | This amendment adds the project to the FY 2014-2017 TIP with $544,900 (federal) in FTA 5307 formula funds. The funds for this project were shifted from TIP # 2008-17-021. | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2015-038 | 2014-85-055 | RTA Operations | This project is being amended to add $544,900 (federal) in previously unobligated FTA 5307 funds to the project in FY 2016 and to correct the required matching amounts to 50% (25% State/25% local) in FY 2015. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2014-013 | 2014-85-057 | RTA Master Plan | This amendment adds the project to the FY 2014-2017 TIP with $170,000 (federal) in FTA 5307 formula funds. The funds for this project are a combination of unobligated funds from FY 2013 ($160,000 from the RTA's Positive Train Control project and $10,000 from the RTA's Storage/Maintenance Yard for Railcars project). | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2014-014 | 226 | Stones River Greenway Extension | This amendment adds the project to the FY 2014-2017 TIP with $3,688,314 (federal) in High Priority Project (HPP) funds. The project was part of the FY 2011-2015 TIP, but was not carried forward to the current TIP. The project is currently active. | 3/19/2014 | 4/08/2014 | 4/25/2014 |
2015-004 | 2014-85-059 | Express Bus Service from Dickson County | This project was amended by resolution of the MPO Executive Board on 12/10/14 to add $410,575 (federal) in CMAQ funds for FY 2015 and 2016 that were awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2014-026 | 2011-16-119 | Goodlettsville Bicycle/Pedestrian Plan - Greenway Connectors | This is a new project for inclusion in the FYs 2014-2017 TIP. The project was included in the FYs 2011-2015 TIP, but was not carried forward to the current TIP. The amendment adds the project to the TIP with remaining CMAQ funds awarded to the City of Goodlettsville for the project. Per MAP-21 requirements, CMAQ funds have a share of 80% federal and 20% local, however through an agreement with TDOT, a portion of construction funds for the project are eligible for 100% federal share. | 9/17/2014 | | |
2015-001 | 2015-65-060 | Bus & Bus Facilities | This project was amended into the FY 2014-2017 TIP by resolution of the MPO Executive Board on 12/10/14. $65,000 (federal) in FTA 5339 funds were shifted from an existing MPO 5339 grouping (TIP #2014-85-028) to fund this project for the Franklin Transit Authority. | 12/10/2014 | | |
2015-003 | 2015-57-061 | Portland Signal Timing Optimization Program | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds $73,400 in 100% federal CMAQ funds that were awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2015-006 | 2015-89-062 | TDOT Help Truck Expansion | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds the project with $2,269,723 (federal) in CMAQ funds awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2015-66-063 | 2015-66-063 | Nolensville Elementary School - Phase 2 | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds the project to the TIP with $113,909 (federal) in Safe Routes to School funds awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2015-008 | 2015-56-064 | Portland West Middle School | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project was added to the TIP with $198,137 (federal) in Safe Routes to School funds awarded to the project by TDOT in 2014. | 12/10/2014 | | |
2015-009 | 2015-19-065 | Franklin Pike Multimodal Plan | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $124,000 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2016-024 | 2015-19-065 | Franklin Pike Multimodal Plan | This amendment adds $133,584 (federal) to this project in FY16. These funds were added in order to extend the project scope and include a larger and more comprehensive area in the study. | 9/21/2016 | | |
2015-010 | 2015-66-066 | Franklin/Cool Springs Bike Share Program | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $2,064,332 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-011 | 2015-56-067 | Gallatin Citywide Sidewalk Improvements - Phase 1 | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $560,000 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-012 | 2015-76-068 | Belinda Parkway Pedestrian Connector | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,248,000 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-013 | 2015-111-069 | North Nashville Mini-Hub | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $748,880 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-014 | 2015-111-070 | Nolensville Pike Mini-Hub | This project was amended into the FY 2014-17 TIP by resolution of the MPO's Executive Board on 12/10/14. It is added to the TIP with $1,487,456 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-015 | 2015-66-071 | Nolensville Small Town Connections | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $413,600 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-016 | 2015-46-072 | Lowry Street Improvements | This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $320,000 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-017 | 2015-56-073 | Lower Station Camp Creek Greenway - Phase 3B | This project is amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,044,416 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-018 | 2015-56-074 | SR-41/US-31W Sidewalk/Bike Lane Project | This project is amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,599,707 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014. | 12/10/2014 | | |
2015-021 | 2015-65-075 | Vehicle Replacement for Vanpool | This amendment shifts $436,480 (federal) in FTA 5307 funds from an existing MPO 5307 grouping (TIP # 2014-85-015) and $150,000 (federal) in FTA 5307 funds from an existing Williamson County/TMA group project (TIP # 2014-85-014) into a new project for Williamson County/TMA Group. | 3/18/2015 | | |
2015-024 | 2015-69-076 | I-40 Truck Climbing Lane | This amendment adds this project to the TIP with $20,880,000 (federal) in NHPP funds. | 3/18/2015 | | |
2015-025 | 2015-87-077 | Signage of US Bike Route 23 | This amendment shifts $17,380 (federal) in U-STP funds from the existing MPO Active Transportation Program grouping (TIP #2014-86-6666) into a new project for TDOT, who will perform the implementation of the signage. | 3/18/2015 | | |
2015-031 | 2013-85-211 | Installation of Wi-Fi on Music City Star Train | This project is amended into the FYs 2014-2017 TIP with $2,400 (federal) in previously unobligated FY 2013 FTA 5307 funds. The older funds have been confirmed to still be available. The project was included in the FYs 2011-2015 TIP, but was not carried forward. | 6/17/2015 | | |
2015-032 | 2013-85-208 | Music City Star Rail Replacement/Track Rehab | This project was amended into the FYs 2014-2017 TIP with $2,880,000 in previously unobligated FY 2013 FTA 5307 funding. The project was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2015-033 | 2013-85-210 | Stationary Fare Collection Equipment | This project was amended into the FYs 2014-2014 TIP with $1,040,000 (federal) in previously unobligated FY 2013 FTA 5307 funds. The project was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2015-034 | 2011-85-127 | Media Fare Purchase | This project is amended into the TIP with $242,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to be available. | 6/17/2015 | | |
2015-035 | 2013-85-207 | Music City Star Passing Siding | This project is amended into the TIP with $844,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to be available. | 6/17/2015 | | |
2015-037 | 2013-85-213 | Rehab/Renovate Stations | This project is amended into the TIP with $488,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2015-039 | 2015-16-214 | Hart Lane Pedestrian Safety Improvements | This project was amended into the TIP with $1,555,894 (federal) in TAP funding awarded to Metro Nashville/Davidson County by the TDOT Transportation Alternatives Office in July of 2015. | 9/16/2015 | | |
2015-040 | 2015-67-215 | Brentwood Signal Timing Optimization Program | This project was amended into the TIP with $216,000 (federal) in CMAQ funds awarded by the TDOT Long Range Planning Division in 2015. | 9/16/2015 | | |
2015-041 | 2015-57-216 | Gallatin ITS & Signal Coordination Project | Gallatin was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-042 | 2015-17-217 | Berry Hill ITS Traffic Signal Coordination Project | Berry Hill (sponsored by Metro Nashville) was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-043 | 2015-17-218 | Goodlettsville Traffic Flow Improvements & Traffic Signal Upgrades (Phase 2) | Goodlettsville was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-044 | 2015-65-219 | Regional Vanpool, Carpool, and One-Stop Shop | Williamson County/TMA Group was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-046 | 2015-15-220 | West End Corridor Transit Service | Nashville MTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-048 | 2015-35-221 | Robertson County Transit Service | RTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2015-049 | 2015-45-222 | Rutherford County Express Bus Service | RTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan. | 9/16/2015 | | |
2016-001 | 2016-89-223 | Ridesharing Application for Carpoolers | This project is amended into the TIP with $100,000 (federal) in CMAQ funds. Hytch, LLC was awarded this funding from the TDOT Multimodal Division during the 2015 Congestion Mitigation and Air Quality Improvement program call-for-projects. | 12/09/2015 | | |
2016-002 | 2016-212-224 | Main Street (SR-6/US-31N) and Donald F. Ephlin Parkway Signage & Landscaping | This project is amended into the TIP with $73,200 (federal) in Roadscapes funding. Columbia was awarded funding for this project several years ago through the now defunct TDOT Roadscapes program, which was a funding set-aside out of statewide Enhancement funds. The project is ready for construction. Due to the fact that it is not a capacity-adding project and funding was awarded directly by TDOT, the MPO feels the project may be added to the TIP so that the project can proceed. | 12/09/2015 | | |
2014-010 | 2008-15-046 | Project Administration for Grant Programs | This amendment shifts $160,000 (federal) of FTA 5307 funds to TIP # 2008-15-048. | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2014-007 | 2008-17-021 | Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS) | This amendment reduces FY 2014 5307 funding by $544,900 (federal) and shifts those funds to create a new operational costs project for RTA (TIP # 2014-85-055). | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2015-030 | 2008-17-021 | Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS) | This project has been amended to shift $3,196,000 (federal) in FYs 2014 and 2015 FTA 5307 funds to TIP# 2008-15-049 and $137,210 (federal) in FY 2015 FTA 5307 funds to TIP# 2014-15-056. This project will be implemented in the future with other funding sources. | 6/17/2015 | | |
2014-012 | 2014-15-056 | Renovate MTA Headquarters (Myatt Drive Facility) | This amendment adds the project to the FY 2014-2017 TIP with $812,637 (federal) in FTA 5307 formula funds. The funds were a combination of unobligated funds from FY 2013. | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2015-029 | 2014-15-056 | Renovate MTA Headquarters (Myatt Drive Facility) | This project has been amended to add a total of $2,467,362 (federal) to the project in FY 2015. New funds originated from $2,330,152 (federal) in previously unobligated FY 2013 FTA 5307 funds and $137,210 (federal) in FY 2015 FTA 5307 funds shifted from TIP# 2008-17-021. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2015-036 | 2013-85-209 | Shore Power for Music City Star Riverfront Station | This project is amended into the TIP with $40,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available. | 6/17/2015 | | |
2014-009 | 2013-89-204 | Northwest Corridor Transit Study | This amendment adds $400,000 (federal) in FTA 5307 funds to FY 2014. These funds are unobligated funds from FY 2013. | 3/19/2014 | 3/28/2014 | 4/09/2014 |
2015-020 | 2014-75-021 | Hamilton Springs Station Construction | This project is being amended to commit $1,472,000 (federal) in U-STP funds held in the MPO’s construction reserve for this project. Preliminary engineering and design is underway, with completion of those phases anticipated in spring of 2015. | 3/18/2015 | | |
2016-011 | 2016-212-226 | West 6th St Streetscape from N Garden St (SR-7/US-31) to N Main St | This amendment adds the project to the FYs 2014-2017 TIP with $363,280 (federal) in L-STP funds in FY 2016. This project was designed in 2011 and is one of five projects being constructed in Columbia using L-STP funds allocated to the City from TDOT’s Small Cities Allocation program. | 6/15/2016 | | |
2016-012 | 2016-212-227 | West 7th Street (SR-99) Streetscape from North Beckett Street to North High Street | This amendment adds the project to the FYs 2014-2017 TIP with $1,409,001 (federal) in TAP and HPP funds in FY 2017. The City of Columbia was awarded Transportation Alternatives Program (TAP) funding from TDOT for this project in 2014 and 2015. In early 2016, the City added High Priority Projects (HPP) funding, also provided by TDOT. | 6/15/2016 | | |
2016-013 | 2016-14-228 | I-24 E Interchange Modification at Hickory Hollow Parkway | This amendment adds the project to the FYs 2014-2017 TIP with all local funding provided by Metro Nashville. These improvements were included in the MPO’s 2035 RTP, the State Transportation Improvement Program, and the Southeast Community Plans developed by TDOT and the MPO. The project is not currently in TDOT’s 3-year Work Program, but additional funding from the State is anticipated. | 6/15/2016 | | |
2016-017 | 2016-82-229 | SR-65 Widening | This amendment adds the project to the FYs 2014-2017 TIP with $24,720,000 (federal) in State STP funds in FY 2017. | 6/15/2016 | | |
2016-029 | 2016-82-229 | SR-65 Widening | This amendment temporarily removes State STP funding from this project so that funds can be placed on other projects in the state that are scheduled for letting in December 2016. This project is scheduled for letting in August 2017. Upon adoption of the FYs 2017-2020 TIP in October, State STP funds will appear as replenished on this project, and the project is expected to proceed as originally scheduled. | 9/21/2016 | | |
2016-018 | 2016-82-230 | SR-96 Widening | This amendment adds the project to the FYs 2014-2017 TIP with $2,480,000 (federal) in NHPP funds in FY 2017. | 6/15/2016 | | |
2016-020 | 2016-84-231 | SR-99 (US-412) Interchange Modification | This amendment adds the project to the FYs 2014-2017 TIP with $1,125,000 (federal) in NHPP funding in FYs 2016 and 2017. | 6/15/2016 | | |
2016-023 | 2016-37-233 | Watauga Elementary SRTS | This amendment proposes to add the project to the TIP with $89,524.40 in 100% federal funds in FY16. | 9/21/2016 | | |
2016-022 | 2016-52-232 | SR-76 Widening (Phase 1) from Charles Drive to Industrial Drive | This amendment adds the project to the TIP with $149,000 in local funds for PE in FY16. Future project funding will be committed by TDOT at a later date. | 9/21/2016 | | |
2016-025 | 2016-18-234 | Old Shiloh Road Bridge over Mansker Creek | This bridge on old Shiloh Road was deemed insufficient and has been closed for some time, thus impeding access to the City of Millersville for residents in the area. TDOT has agreed to commit funding from its Off-System Bridge Replacement Program in the amount of $575,386 (federal) to this project in order to replace the bridge. There is a required 20% local match with this program. | 9/21/2016 | | |
2016-026 | 2016-34-235 | I-65 Interchange Lighting at SR-257 | The City of Millersville will be constructing this safety project in a 50/50 partnership with TDOT, who have committed State Betterment funds to the project in the amount of $481,800. The City of Millersville will be responsible for covering the remaining 50% of project funding. | 9/21/2016 | | |
2016-027 | 2016-56-236 | Rucker Stewart Middle SRTS | The City of Gallatin was awarded $250,000 (federal) for this project in July 2016 by the TODT Safe Routes to School Program. $25,000 (federal) that is slated for the education program implementation portion of the project in FY 2018 will be added following adoption of the FYs 2017-2020 Transportation Improvement Program. | 9/21/2016 | | |
2016-028 | 2016-76-237 | Elzie Patton Elementary and Mt. Juliet Middle SRTS | The City of Mt. Juliet was awarded $250,000 (federal) for this project in July 2016 by the TODT Safe Routes to School Program. | 9/21/2016 | | |
2016-030 | 2016-21-238 | Saturn Parkway (SR-396) Extension to Beechcroft Road (SR-247) | TDOT is requesting that this project be added to the TIP with $19,929,520 (federal) in FY 2017 state STP funds. | 9/21/2016 | | |