Transportation Improvement Program for FYs 2014-2017

Map

Program Summary

12/11/2013 10/1/2013 through 9/30/2016
241
$1,267,514,435.49 Anna Emerson (615) 862-7157, emerson@nashvillempo.org

Project List

Search for projects by keyword:     View Map  | Share

241 projects meet the search criteria:

TIP ID#Project NameImprovementLocationLead AgencyTotal Cost
2002-028Rockland Road WideningMRoad WideningSumner CountyHendersonville$12,624,690.00
2002-029Walton Ferry and Old Shackle Island Rd Improvements ProjectMIntersectionSumner CountyHendersonville$12,565,325.00
2004-004Increased Guidance for Improved MobilityMSignage/WayfindingDavidson CountyMetro Nashville$600,000.00
2004-005Jefferson Street IntersectionsMIntersectionDavidson CountyMetro Nashville$1,410,000.00
2004-009Wayfinding Sign ProgramMITSDavidson CountyMetro Nashville$1,725,250.00
2004-051SR-247 (Duplex Road) WideningMRoad WideningWilliamson CountyTDOT$22,251,595.00
2004-058Concord Road (SR-253) WideningMRoad WideningWilliamson CountyTDOT$20,800,000.00
2005-0065307 Urban Operating for Rover Public Transit - Relax & Ride ServiceMTransit OperationsRutherford CountyMurfreesboro Public Transit$940,000.00
2005-0075307 Urban Operating for Rover Public Transit - Mid-Cumberland Human Resource Agency (MCHRA) ContractMTransit OperationsRutherford CountyMurfreesboro Public Transit$520,000.00
2006-013Concord Road (SR-253) WideningMRoad WideningWilliamson CountyBrentwood$5,290,000.00
Show # of items:

Reports & Tables

Report Name Description
Custom Project List Report Print or export a detailed list of all or selected projects
Project Information Sheets Print or export detailed information about individual projects
Funding Summary by Program Year and Grant Source View current balances of programmed funds by year and grant
Request another type of report Send us your request

List of Amendments

Amendment #TIP ID#ProjectActionMPO AdoptionTDOTFederal
2016-0192004-051SR-247 (Duplex Road) WideningThis amendment adds $13,856,880 (federal) in State STP funds to the project in FY 2017 for construction.6/15/2016  
2014-0112008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis amendment adds $340,480 (federal) in FTA 5307 funds to FY 2014. The additional funds for this project are a combination of unobligated funds from FY 2013 and funds being shifted from TIP # 2008-15-046.3/19/20143/28/20144/09/2014
2014-0282008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis amendment adds $377,529 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment.9/17/2014  
2015-0282008-15-049MTA - Administration Building Rehabilitation (Nestor)This project has been amended to advance the project schedule and add $3,196,000 (federal) in FYs 2014 and 2015 FTA 5307 funds shifted to the project from TIP# 2008-17-021. Projected FY 2017 funding amounts have been dropped from the project. 6/17/2015  
2014-0012014-76-017Town Center TrailThis amendment combines Phases II and III of the project and adds $827,064 (federal) in CMAQ funds from a previous CMAQ award that was not programmed into the FYs 2014-2017 TIP prior to its adoption.3/19/20144/08/20144/25/2014
2014-0152009-72-035SR-109 Reconstruction & WideningAn additional $9,760,000 (federal) in National Highway Performance Program funds is being added to the project.6/18/20147/01/20147/16/2014
2015-0472009-85-012Express Bus Service from Williamson CountyRTA was awarded $763,200 (federal) for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project.9/16/2015  
2014-0022011-54-156Tyree Springs (SR-258) / S Palmers Chapel Intersection ImprovementsThis amendment adds $270,457 in State Safety funds to match the approved contract with TDOT.3/19/20144/08/20144/25/2014
2015-0052011-85-125Expansion of Regional Bus ServicesThis project was amended by resolution of the MPO Executive Board on 12/10/14 to add $274,758 (federal) in CMAQ funds awarded to the project by TDOT in 2014.12/10/2014  
2014-0252011-610-165Fairview 3R Improvement Projects GroupingThe City of Fairview is requesting that a previously unprogrammed $300,000 (federal) in local Surface Transportation Program (L-STP) funding be added to fiscal year 2014.6/18/2014 7/16/2014
2015-0452012-15-179Express Bus Service to MadisonMTA was awarded $1,113,000 (federal) in CMAQ funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project.9/16/2015  
2015-0502012-85-180NE Corridor Regional Express Bus ServiceRTA was awarded $763,200 (federal) for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the new funds to the existing TIP project.9/16/2015  
2014-0302014-85-012Purchase and/or rehab Locomotive and rail carsThis amendment adds $2,401,787.00 (federal share) in FTA 5337 funds to TIP #2014-85-012 in FY 2014. These are new formula funds from the State of Good Repair Program apportioned in February 2014 to the Nashville-Davidson Urbanized Area. The State of Good Repair (SGR) program provides capital assistance for maintenance, rehabilitation, and replacement projects for existing fixed guideway and high intensity motorbus systems.9/17/2014  
2015-0232014-85-014Regional Park & RideThis amendment shifts $150,000 (federal) in FY14 FTA 5307 funds to a new project for Williamson County/TMA Group (TIP # 2015-65-075).3/18/2015  
2015-0222014-85-015Vanpool Vehicle ReplacementsThis amendment shifts $436,480 (federal) in FY14 FTA 5307 funds to a new project for Williamson County/TMA Group (TIP # 2015-65-075).3/18/2015  
2015-0262014-86-6666MPO Active Transportation ProgramThis amendment shifts $17,380 (federal) in U-STP funds to a new project for TDOT (TIP# 2015-87-077).3/18/2015  
2015-0192014-86-6666MPO Active Transportation ProgramThis project was amended by resolution of the MPO Executive Board on 12/10/14. It shifts $4,280,043 (federal) in U-STP funds and $5,330,348 (federal) in U-ALT funds to various new projects awarded by the MPO's Active Transportation Program in 2014.12/10/2014  
2016-0152014-89-9999MPO ITS/Ops ProgramThis amendment shifts $192,000 (federal) to TIP# 2013-77-218 in order to cover project cost overruns and bring the project to completion.6/15/2016  
2014-0292014-85-023Music City Star Miscellaneous Support Equipment & Passenger AmenitiesThis amendment adds $54,182 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment.9/17/2014  
2014-0172014-18-045I-65/ I-40 Bridge RehabilitationThis project is amended to add $44,100,000 (federal) in NHPP funding to fiscal year 2014 in the form of an additional phase for Construction. The total project cost was increased accordingly.6/18/20147/01/20147/16/2014
2016-0142013-77-218SR-171 (Mt. Juliet Road) Traffic Adaptive Signal Control System Corridor Optimization ProjectThis amendment adds $192,000 (federal) to this project from a bucket of funding identified in TIP# 2014-89-9999 for ITS projects and projects that improve the operations of the regional system without adding capacity. The City of Mt. Juliet has been pursuing an adaptive signal system. Upon bidding the construction portion of the project, the City found that previous estimates were insufficient and is revising project cost utilizing this available funding based on updated bids.6/15/2016  
2015-0022014-85-028Bus & Bus Facilities (Grouping) - Nashville-Davidson UZAThis project was amended by resolution of the MPO Executive Board on 12/10/14. $65,000 (federal) in FTA 5339 funds were shifted from FY 2014 into a new project for the Franklin Transit Authority (TIP #2015-65-060).12/10/2014  
2016-0212014-310-041Springfield 3R Improvements Program (Grouping)This project was amended to add $199,928 (federal) to this project in FY16. These funds were allocated to the City of Springfield by TDOT through its Small Cities STP Allocation Program. They are FY 2015 funds that were allocated a year behind the normal timeframe due to the absence of a long term federal transportation bill.9/21/2016  
2014-0272014-36-042Springfield Greenway - Phase 3This amendment makes several updates to the existing project in the TIP. The project title is being altered to better identify the project and the project description has also been updated accordingly. Funds on the previous TIP page were incorrectly identified as ENH funds. They have been corrected to HPP funds and new HPP and TAP funds awarded to the project have been added as shown.9/17/2014  
2014-0032004-022SR-76 SidewalksProject added to the FY 2014-2017 TIP with $149,024 (federal)3/19/20144/08/20144/25/2014
2014-0042006-117Hillsboro Road (SR-106/US-431) WideningThis amendment adds the project to the FY 2014-2017 TIP with $500,000 (federal)3/19/20144/08/20144/25/2014
2014-0052014-66-053Nolensville Elementary SchoolThis amendment adds the project to the FY 2014-2017 TIP with $101,250 (federal)3/19/20144/08/20144/25/2014
2014-0062014-56-054Watt Hardison Elementary SchoolThis amendment adds the project to the FY 2014-2017 TIP with $208,166 (federal)3/19/20144/08/20144/25/2014
2014-0082014-85-055RTA OperationsThis amendment adds the project to the FY 2014-2017 TIP with $544,900 (federal) in FTA 5307 formula funds. The funds for this project were shifted from TIP # 2008-17-021.3/19/20143/28/20144/09/2014
2015-0382014-85-055RTA OperationsThis project is being amended to add $544,900 (federal) in previously unobligated FTA 5307 funds to the project in FY 2016 and to correct the required matching amounts to 50% (25% State/25% local) in FY 2015. Older funds have been confirmed to still be available.6/17/2015  
2014-0132014-85-057RTA Master PlanThis amendment adds the project to the FY 2014-2017 TIP with $170,000 (federal) in FTA 5307 formula funds. The funds for this project are a combination of unobligated funds from FY 2013 ($160,000 from the RTA's Positive Train Control project and $10,000 from the RTA's Storage/Maintenance Yard for Railcars project).3/19/20143/28/20144/09/2014
2014-014226Stones River Greenway ExtensionThis amendment adds the project to the FY 2014-2017 TIP with $3,688,314 (federal) in High Priority Project (HPP) funds. The project was part of the FY 2011-2015 TIP, but was not carried forward to the current TIP. The project is currently active.3/19/20144/08/20144/25/2014
2015-0042014-85-059Express Bus Service from Dickson CountyThis project was amended by resolution of the MPO Executive Board on 12/10/14 to add $410,575 (federal) in CMAQ funds for FY 2015 and 2016 that were awarded to the project by TDOT in 2014.12/10/2014  
2014-0262011-16-119Goodlettsville Bicycle/Pedestrian Plan - Greenway ConnectorsThis is a new project for inclusion in the FYs 2014-2017 TIP. The project was included in the FYs 2011-2015 TIP, but was not carried forward to the current TIP. The amendment adds the project to the TIP with remaining CMAQ funds awarded to the City of Goodlettsville for the project. Per MAP-21 requirements, CMAQ funds have a share of 80% federal and 20% local, however through an agreement with TDOT, a portion of construction funds for the project are eligible for 100% federal share.9/17/2014  
2015-0012015-65-060Bus & Bus FacilitiesThis project was amended into the FY 2014-2017 TIP by resolution of the MPO Executive Board on 12/10/14. $65,000 (federal) in FTA 5339 funds were shifted from an existing MPO 5339 grouping (TIP #2014-85-028) to fund this project for the Franklin Transit Authority.12/10/2014  
2015-0032015-57-061Portland Signal Timing Optimization ProgramThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds $73,400 in 100% federal CMAQ funds that were awarded to the project by TDOT in 2014.12/10/2014  
2015-0062015-89-062TDOT Help Truck ExpansionThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds the project with $2,269,723 (federal) in CMAQ funds awarded to the project by TDOT in 2014.12/10/2014  
2015-66-0632015-66-063Nolensville Elementary School - Phase 2This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It adds the project to the TIP with $113,909 (federal) in Safe Routes to School funds awarded to the project by TDOT in 2014.12/10/2014  
2015-0082015-56-064Portland West Middle SchoolThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project was added to the TIP with $198,137 (federal) in Safe Routes to School funds awarded to the project by TDOT in 2014.12/10/2014  
2015-0092015-19-065Franklin Pike Multimodal PlanThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $124,000 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2016-0242015-19-065Franklin Pike Multimodal PlanThis amendment adds $133,584 (federal) to this project in FY16. These funds were added in order to extend the project scope and include a larger and more comprehensive area in the study.9/21/2016  
2015-0102015-66-066Franklin/Cool Springs Bike Share ProgramThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $2,064,332 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0112015-56-067Gallatin Citywide Sidewalk Improvements - Phase 1This project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. The project is added to the TIP with $560,000 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0122015-76-068Belinda Parkway Pedestrian ConnectorThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,248,000 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0132015-111-069North Nashville Mini-HubThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $748,880 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0142015-111-070Nolensville Pike Mini-HubThis project was amended into the FY 2014-17 TIP by resolution of the MPO's Executive Board on 12/10/14. It is added to the TIP with $1,487,456 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0152015-66-071Nolensville Small Town ConnectionsThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $413,600 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0162015-46-072Lowry Street ImprovementsThis project was amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $320,000 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0172015-56-073Lower Station Camp Creek Greenway - Phase 3BThis project is amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,044,416 (federal) in U-ALT funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0182015-56-074SR-41/US-31W Sidewalk/Bike Lane ProjectThis project is amended into the FY 2014-17 TIP by resolution of the MPO Executive Board on 12/10/14. It is added to the TIP with $1,599,707 (federal) in U-STP funds awarded to the project through the MPO's Active Transportation Program grants in 2014.12/10/2014  
2015-0212015-65-075Vehicle Replacement for VanpoolThis amendment shifts $436,480 (federal) in FTA 5307 funds from an existing MPO 5307 grouping (TIP # 2014-85-015) and $150,000 (federal) in FTA 5307 funds from an existing Williamson County/TMA group project (TIP # 2014-85-014) into a new project for Williamson County/TMA Group.3/18/2015  
2015-0242015-69-076I-40 Truck Climbing LaneThis amendment adds this project to the TIP with $20,880,000 (federal) in NHPP funds.3/18/2015  
2015-0252015-87-077Signage of US Bike Route 23This amendment shifts $17,380 (federal) in U-STP funds from the existing MPO Active Transportation Program grouping (TIP #2014-86-6666) into a new project for TDOT, who will perform the implementation of the signage.3/18/2015  
2015-0312013-85-211Installation of Wi-Fi on Music City Star TrainThis project is amended into the FYs 2014-2017 TIP with $2,400 (federal) in previously unobligated FY 2013 FTA 5307 funds. The older funds have been confirmed to still be available. The project was included in the FYs 2011-2015 TIP, but was not carried forward.6/17/2015  
2015-0322013-85-208Music City Star Rail Replacement/Track RehabThis project was amended into the FYs 2014-2017 TIP with $2,880,000 in previously unobligated FY 2013 FTA 5307 funding. The project was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available.6/17/2015  
2015-0332013-85-210Stationary Fare Collection EquipmentThis project was amended into the FYs 2014-2014 TIP with $1,040,000 (federal) in previously unobligated FY 2013 FTA 5307 funds. The project was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available.6/17/2015  
2015-0342011-85-127Media Fare PurchaseThis project is amended into the TIP with $242,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to be available.6/17/2015  
2015-0352013-85-207Music City Star Passing SidingThis project is amended into the TIP with $844,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to be available.6/17/2015  
2015-0372013-85-213Rehab/Renovate StationsThis project is amended into the TIP with $488,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available.6/17/2015  
2015-0392015-16-214Hart Lane Pedestrian Safety ImprovementsThis project was amended into the TIP with $1,555,894 (federal) in TAP funding awarded to Metro Nashville/Davidson County by the TDOT Transportation Alternatives Office in July of 2015.9/16/2015  
2015-0402015-67-215Brentwood Signal Timing Optimization Program This project was amended into the TIP with $216,000 (federal) in CMAQ funds awarded by the TDOT Long Range Planning Division in 2015. 9/16/2015  
2015-0412015-57-216Gallatin ITS & Signal Coordination ProjectGallatin was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0422015-17-217Berry Hill ITS Traffic Signal Coordination ProjectBerry Hill (sponsored by Metro Nashville) was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0432015-17-218Goodlettsville Traffic Flow Improvements & Traffic Signal Upgrades (Phase 2)Goodlettsville was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0442015-65-219Regional Vanpool, Carpool, and One-Stop ShopWilliamson County/TMA Group was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0462015-15-220West End Corridor Transit ServiceNashville MTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0482015-35-221Robertson County Transit ServiceRTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2015-0492015-45-222Rutherford County Express Bus ServiceRTA was awarded funding for this project by the TDOT Long Range Planning Division following the 2015 Congestion Mitigation and Air Quality Improvement (CMAQ) Program’s competitive call for projects. This amendment adds the newly funded project to the TIP under the CMAQ allowance in the MPO’s 2035 Regional Transportation Plan.9/16/2015  
2016-0012016-89-223Ridesharing Application for CarpoolersThis project is amended into the TIP with $100,000 (federal) in CMAQ funds. Hytch, LLC was awarded this funding from the TDOT Multimodal Division during the 2015 Congestion Mitigation and Air Quality Improvement program call-for-projects.12/09/2015  
2016-0022016-212-224Main Street (SR-6/US-31N) and Donald F. Ephlin Parkway Signage & LandscapingThis project is amended into the TIP with $73,200 (federal) in Roadscapes funding. Columbia was awarded funding for this project several years ago through the now defunct TDOT Roadscapes program, which was a funding set-aside out of statewide Enhancement funds. The project is ready for construction. Due to the fact that it is not a capacity-adding project and funding was awarded directly by TDOT, the MPO feels the project may be added to the TIP so that the project can proceed.12/09/2015  
2014-0102008-15-046Project Administration for Grant ProgramsThis amendment shifts $160,000 (federal) of FTA 5307 funds to TIP # 2008-15-048.3/19/20143/28/20144/09/2014
2014-0072008-17-021Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS)This amendment reduces FY 2014 5307 funding by $544,900 (federal) and shifts those funds to create a new operational costs project for RTA (TIP # 2014-85-055).3/19/20143/28/20144/09/2014
2015-0302008-17-021Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS) This project has been amended to shift $3,196,000 (federal) in FYs 2014 and 2015 FTA 5307 funds to TIP# 2008-15-049 and $137,210 (federal) in FY 2015 FTA 5307 funds to TIP# 2014-15-056. This project will be implemented in the future with other funding sources.6/17/2015  
2014-0122014-15-056Renovate MTA Headquarters (Myatt Drive Facility)This amendment adds the project to the FY 2014-2017 TIP with $812,637 (federal) in FTA 5307 formula funds. The funds were a combination of unobligated funds from FY 2013.3/19/20143/28/20144/09/2014
2015-0292014-15-056Renovate MTA Headquarters (Myatt Drive Facility)This project has been amended to add a total of $2,467,362 (federal) to the project in FY 2015. New funds originated from $2,330,152 (federal) in previously unobligated FY 2013 FTA 5307 funds and $137,210 (federal) in FY 2015 FTA 5307 funds shifted from TIP# 2008-17-021. Older funds have been confirmed to still be available.6/17/2015  
2015-0362013-85-209Shore Power for Music City Star Riverfront StationThis project is amended into the TIP with $40,000 (federal) in previously unobligated FTA 5307 funds. It was included in the FYs 2011-2015 TIP, but was not carried forward. Older funds have been confirmed to still be available. 6/17/2015  
2014-0092013-89-204Northwest Corridor Transit StudyThis amendment adds $400,000 (federal) in FTA 5307 funds to FY 2014. These funds are unobligated funds from FY 2013.3/19/20143/28/20144/09/2014
2015-0202014-75-021Hamilton Springs Station ConstructionThis project is being amended to commit $1,472,000 (federal) in U-STP funds held in the MPO’s construction reserve for this project. Preliminary engineering and design is underway, with completion of those phases anticipated in spring of 2015.3/18/2015  
2016-0112016-212-226West 6th St Streetscape from N Garden St (SR-7/US-31) to N Main StThis amendment adds the project to the FYs 2014-2017 TIP with $363,280 (federal) in L-STP funds in FY 2016. This project was designed in 2011 and is one of five projects being constructed in Columbia using L-STP funds allocated to the City from TDOT’s Small Cities Allocation program.6/15/2016  
2016-0122016-212-227West 7th Street (SR-99) Streetscape from North Beckett Street to North High StreetThis amendment adds the project to the FYs 2014-2017 TIP with $1,409,001 (federal) in TAP and HPP funds in FY 2017. The City of Columbia was awarded Transportation Alternatives Program (TAP) funding from TDOT for this project in 2014 and 2015. In early 2016, the City added High Priority Projects (HPP) funding, also provided by TDOT.6/15/2016  
2016-0132016-14-228I-24 E Interchange Modification at Hickory Hollow ParkwayThis amendment adds the project to the FYs 2014-2017 TIP with all local funding provided by Metro Nashville. These improvements were included in the MPO’s 2035 RTP, the State Transportation Improvement Program, and the Southeast Community Plans developed by TDOT and the MPO. The project is not currently in TDOT’s 3-year Work Program, but additional funding from the State is anticipated.6/15/2016  
2016-0172016-82-229SR-65 WideningThis amendment adds the project to the FYs 2014-2017 TIP with $24,720,000 (federal) in State STP funds in FY 2017.6/15/2016  
2016-0292016-82-229SR-65 WideningThis amendment temporarily removes State STP funding from this project so that funds can be placed on other projects in the state that are scheduled for letting in December 2016. This project is scheduled for letting in August 2017. Upon adoption of the FYs 2017-2020 TIP in October, State STP funds will appear as replenished on this project, and the project is expected to proceed as originally scheduled.9/21/2016  
2016-0182016-82-230SR-96 WideningThis amendment adds the project to the FYs 2014-2017 TIP with $2,480,000 (federal) in NHPP funds in FY 2017.6/15/2016  
2016-0202016-84-231SR-99 (US-412) Interchange ModificationThis amendment adds the project to the FYs 2014-2017 TIP with $1,125,000 (federal) in NHPP funding in FYs 2016 and 2017.6/15/2016  
2016-0232016-37-233Watauga Elementary SRTSThis amendment proposes to add the project to the TIP with $89,524.40 in 100% federal funds in FY16.9/21/2016  
2016-0222016-52-232SR-76 Widening (Phase 1) from Charles Drive to Industrial DriveThis amendment adds the project to the TIP with $149,000 in local funds for PE in FY16. Future project funding will be committed by TDOT at a later date.9/21/2016  
2016-0252016-18-234Old Shiloh Road Bridge over Mansker CreekThis bridge on old Shiloh Road was deemed insufficient and has been closed for some time, thus impeding access to the City of Millersville for residents in the area. TDOT has agreed to commit funding from its Off-System Bridge Replacement Program in the amount of $575,386 (federal) to this project in order to replace the bridge. There is a required 20% local match with this program.9/21/2016  
2016-0262016-34-235I-65 Interchange Lighting at SR-257The City of Millersville will be constructing this safety project in a 50/50 partnership with TDOT, who have committed State Betterment funds to the project in the amount of $481,800. The City of Millersville will be responsible for covering the remaining 50% of project funding.9/21/2016  
2016-0272016-56-236Rucker Stewart Middle SRTSThe City of Gallatin was awarded $250,000 (federal) for this project in July 2016 by the TODT Safe Routes to School Program. $25,000 (federal) that is slated for the education program implementation portion of the project in FY 2018 will be added following adoption of the FYs 2017-2020 Transportation Improvement Program.9/21/2016  
2016-0282016-76-237Elzie Patton Elementary and Mt. Juliet Middle SRTSThe City of Mt. Juliet was awarded $250,000 (federal) for this project in July 2016 by the TODT Safe Routes to School Program.9/21/2016  
2016-0302016-21-238Saturn Parkway (SR-396) Extension to Beechcroft Road (SR-247)TDOT is requesting that this project be added to the TIP with $19,929,520 (federal) in FY 2017 state STP funds.9/21/2016  

List of Administrative Modifications

Adjustment #TIP ID#ProjectActionMPO Approval
2016-0062002-028Rockland Road WideningThis project was adjusted to shift $653,200 (federal) in FY16 U-STP funds to TIP# 2006-014 and $760,000 (federal) in FY16 U-STP funds to TIP# 2012-56-171.12/17/2015
2016-0042004-051SR-247 (Duplex Road) WideningThis project has been adjusted to add $389,799 in federal local STP dollars that were allocated to the City during FY15. The City has chosen at this time to expend these funds on this project.12/01/2015
2016-0402004-051SR-247 (Duplex Road) WideningThis project is being adjusted to add $409,710 (federal) in L-STP funds to the ROW phase of the project in FY16. This funding was allocated to the City of Spring Hill for FY16 by TDOT's Small Cities Allocation Program.9/30/2016
2014-0122008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis project is being adjusted to add $85,120 (federal share) FTA 5307 funds in FY 2014. The additional funds for this project are a combination of unobligated funds from FY2013 MTA projects.4/25/2014
2016-0212008-15-054Bus Purchase and Replacement, electric buses, zero emission busesThis project is being adjusted to add funds awarded to the project by the TDOT Multimodal Division during the 2015 CMAQ funding competition. Nashville MTA was awarded $2,339,846 (federal) to procure three hybrid electric-diesel buses over three years. FY18 funding will be reflected in the next TIP. The current funding added is $1,559,898 (federal).3/12/2016
2014-0012008-54-033Gallatin Various Intersection Improvements Project adjusted to add $44,800 (federal) for construction in FY 2014 due to the most recent cost estimate from TDOT.1/07/2014
2016-0312008-56-082Lower Station Camp Creek Road Streetscape and Pavement Project (Greenway) Phase 1This project is being adjusted to change the funding type for CONST from U-RSV to U-ALT. This change is made possible by a removal of U-ALT funds from TIP# 2015-66-066.8/15/2016
2016-0172008-64-037SR-106 (Hillsboro Rd ) and SR-46 Re-alignment/ Signalization.This project is being adjusted to shift $60,000 (federal) from the PE-D phase to the PE-N phase in order to cover an increase in PE-N costs due to necessary geotech work completed on the project.3/12/2016
2015-0082008-71-038Beckwith Road/Eastern ConnectorThis project is being adjusted to correct the description of the project's scope. The description is being reverted back to the original description from the MPO's FY 2008-2011 TIP. It was changed at the adoption of the FY 2011-2015 TIP due to an error on the project's application submitted for the MPO's 2035 Regional Transportation Plan. NEPA documentation for the project was performed previously with the correct project scope reflected by this adjustment.2/11/2015
2014-0142008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to include $700,000 (federal) of PHSIP funds in FY 20145/23/2014
2014-0072008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to add $ 3,150,000 (federal share) HSIP funds in FY 2014.2/28/2014
2014-0102008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to add $1,500,000 (federal share) in HSIP funds in FY 2014. The type of work for all fiscal years was changed to "PE, ROW, CONST." The adjustment also includes an updated groupings crosswalk outlining those projects that might be authorized with a higher federal share.4/24/2014
2015-0292008-84-013Highway Safety Improvement Program (HSIP) GroupingThis adjustment adds $330,000 (federal) in HSIP (PHSIP) funds to the project in FY15. The adjustment was submitted directly to FHWA by TDOT.7/23/2015
2016-0102008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to add $900,000 (federal) in HSIP funds and $100,000 (federal) in PHSIP funds in FY16. The adjustment was requested directly to FHWA by TDOT.1/27/2016
2016-0132008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to add $500,000 (federal) in PHSIP funds in FY16. The adjustment was requested directly to FHWA by TDOT.2/28/2016
2016-0152008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project is being adjusted to add $3,600,000 (federal) in HSIP funds and $400,000 (federal) in PHSIP funds in FY16. The adjustment was requested directly to FHWA by TDOT.3/01/2016
2016-0282008-84-013Highway Safety Improvement Program (HSIP) GroupingThis project was adjusted to add $1,032,000 (State) to FY16 ACHSIP funds and $890,000 (State) to FY16 ACPHSIP funds.5/27/2016
2015-0322009-56-027Town Creek GreenwayThis project was adjusted to add $916,916 (federal) in CMAQ funds in FY16. These funds were previously awarded by TDOT, but left off the original project contract as well as the TIP. They are being recovered at this time in order to complete project work.10/19/2015
2014-0022009-84-033I-40 Ramp ImprovementsProject adjusted to change the fiscal year for Construction from FY 2014 to FY 2015. There is no change to the programmed funding amounts and the total project cost remained the same. 1/09/2014
2015-0112011-14-042Battery Lane / Harding Place at Franklin Road ImprovementsThis project is being adjusted to shift funds from the CONST line into the ROW line to aid in covering an unanticpated increase in ROW costs. The funds are also being brought forward into FY 15 in order to allow these changes.3/10/2015
2017-0022014-111-026Complete Streets Implementation on BRT Lite Corridors - Gallatin PikeThis project was adjusted to to better define phases of work and funding for each. Additionally, local matching funds have been corrected to display a proper 20% local match for each phase. There is no change in the federal share of the project cost at this time.10/26/2016
2017-0012011-510-017Airport Road RelocationThis project is being adjusted to clarify the termini for the road relocation and to add $603,473 in State (SIA) funding for construction in FY17.10/25/2016
2016-009AM-018SR-109This project has been adjusted to add $800,000 (federal) in FY16 NHPP funds for construction.1/27/2016
2013-0482011-16-166Warner Parks Trail Linkage ImprovementsProject adjusted to modify the description. The pedestrian tunnel under Hwy 100 will now be an at grade crossing at the intersection with Old Hickory Boulevard. The amounts programmed remain unchanged.12/20/2013
2014-0042012-62-167Lewisburg Pike (SR-248) WideningProject adjusted to change the funding source from Surface Transportation Program (STP) to 100% State Funds (STA). There is no change to the programmed funding amounts and the total project cost remained the same. 1/09/2014
2016-0082012-56-171Sanders Ferry/ Drakes Creek Bike TrailThis project was adjusted to add $760,000 (federal) in FY16 U-STP funds from TIP# 2002-028 for PE-N and CONST. Additionally, $40,000 (federal) in FY14 CMAQ funds originally to be used for ROW were shifted to FY16 PE-D and CONST.12/17/2015
2015-0092012-44-172Sam Ridley Pkwy & Stonecrest Pkwy Intersection ImprovementsThis project is being adjusted to add $8,000 (federal) in M-STP funds for PE-D. Funding for PE-D was allocated to this project in the FY 2011-2015 TIP, however that funding was never obligated. Jurisdictions in the Murfreesboro UZA agreed to replace the funding that was left behind from the current balance of unprogrammed M-STP funds.2/11/2015
2016-0192012-44-172Sam Ridley Pkwy & Stonecrest Pkwy Intersection ImprovementsThis project is being adjusted to reallocate $32,000 (federal) from the ROW phase to the PE-D phase of project work in order to cover higher than anticipated PE-D expenses.3/12/2016
2016-0302012-66-187Small Town ConnectionsThis project is being adjusted to add $204,449 (federal) in U-ALT funds shifted from TIP# 2015-66-066 for increased ROW and CONST costs.8/15/2016
2016-0052012-66-189Thompson's Station Greenway - Phase 1This project has been adjusted to move the 20% matching responsibility from the State to the local government.12/08/2015
2014-0082014-86-6666MPO Active Transportation ProgramMoved $200,000.00 (federal) and $50,000 (local) from existing 2014 U-STP line with "PE, ROW, CONSTRUCTION" type of work into a new 2014 U-STP line with an "IMPLEMENTATION" type of work. Set-aside funds are to be used for the hiring of the Metro Nashville Active Mobility Planner.3/14/2014
2016-0352014-86-6666MPO Active Transportation ProgramThis project is being adjusted to decrease projected FY17 U-ALT funding by $51,617 (federal) in order to reflect actual FY17 apportionment.8/15/2016
2014-0132014-79-018Interchange Lighting on I-40 at Mt. Juliet RoadThis project was adjusted to remove $140,000 (federal) in U-STP funds originally allocated to the project. The project was approved to receive Interchange Lighting Program funds from the State in the amount of $359,000 with a $359,000 local match.5/28/2014
2016-0242014-45-0195307 Urban capital Funding for Rover Public - Capital for Preventive Maintenance ActivitiesThis project is being adjusted to add $30,000 (federal) in FTA 5307-M funds in FY 2016 from TIP# 2014-45-020.5/26/2016
2016-0232014-45-0205307 Urban Capital for Rover Public Transit- Additional PE for New Transit FacilityThis project is being adjusted to shift $30,000 (federal) in FTA 5307-M funds from this project to TIP# 2014-45-019.5/26/2016
2014-0032014-110-044Donelson Pike (SR-255) RelocationProject adjusted to change the fiscal year for Design (PE-D) from FY 2014 to FY 2015. There is no change to the programmed funding amounts and the total project cost remained the same. 1/09/2014
2014-0252014-18-045I-65/ I-40 Bridge RehabilitationThis project was adjusted to add $14,310,000 (federal) in NHPP funds in FY2014.10/16/2014
2014-0262014-18-045I-65/ I-40 Bridge RehabilitationThis project was adjusted to add $3,520,000 (federal) in NHPP funds in FY2014.10/16/2014
2014-0272014-18-045I-65/ I-40 Bridge RehabilitationThis project was adjusted to shift funds from CONST to PE-D and reduce NHPP funding for CONST by $41,800 (federal).10/16/2014
2014-0092014-89-046National Highway Performance Program (NHPP) GroupingThis project is being adjusted to add $14,400,000 (federal share) in NHPP funds in FY 2014. Some of the adjusted amount was increased in previous adjustments made and not communicated by TDOT. See additional supporting documentation. The type of work for all fiscal years was changed to "PE, ROW, CONST." The adjustment also includes an updated groupings crosswalk outlining those projects that might be authorized with a higher federal share.4/23/2014
2016-0022014-89-046National Highway Performance Program (NHPP) GroupingThis project has been adjusted to add $5,000,000 in State ACNHPP funds. The request was made directly to FHWA by TDOT.12/01/2015
2015-0302014-89-046National Highway Performance Program (NHPP) GroupingThis project was adjusted to add $12,000,000 (federal) in NHPP funds to the project in FY15. The adjustment was requested directly to FHWA by TDOT.10/12/2015
2016-0142014-89-046National Highway Performance Program (NHPP) GroupingThis project is being adjusted to add $24,000,000 (federal) in NHPP funds to the project in FY16. The adjustment was requested directly to FHWA by TDOT.3/01/2016
2016-0262014-89-046National Highway Performance Program (NHPP) GroupingThis project was adjusted to add $2,833,000 (State) to FY16 ACNHPP funds.5/27/2016
2016-0272014-89-047Surface Transportation Program (STP) GroupingThis project was adjusted to add $2,688,000 (State) to FY16 ACSTP funds.5/27/2016
2016-0112014-89-047Surface Transportation Program (STP) GroupingThis project is being adjusted to add $150,000 in State ACSTP funds to the project in FY16. The adjustment was requested directly to FHWA by TDOT.1/27/2016
2016-0012014-89-047Surface Transportation Program (STP) GroupingThis project was adjusted to add $300,000 in State ACSTP funds in FY16. The adjustment was requested directly to FHWA by TDOT.11/05/2015
2014-0112014-89-047Surface Transportation Program (STP) GroupingThis project is being adjusted to add $800,000 (federal share) in STP funds in FY 2014. Some of the adjusted amount was increased in previous adjustments made and not communicated by TDOT. See additional supporting documentation. The type of work for all fiscal years was changed to "PE, ROW, CONST." The adjustment also includes an updated groupings crosswalk outlining those projects that might be authorized with a higher federal share.4/24/2014
2016-0162013-87-217Regional Traffic Management Study and Signal Optimization PlanThis project is being adjusted to shift unexpended PE-N funds to PE-D. Additionally, the project will not need funding for ROW/UTILITIES, so those funds have also been shifted to PE-D.3/08/2016
2016-0372014-66-030Fairview Middle School SidewalkThis project is being adjusted to add $98,679 (federal) in L-STP funds allocated to the City of Fairview for FY 2016 through TDOT's Small Cities Allocation Program.8/31/2016
2015-0312014-612-035Fairview Boulevard WestThis project has been adjusted to add PE-D as an eligible type of work. Funding is not changing, but funds are being brought forward into FY 16 to allow for the adjustment.10/15/2015
2016-0032014-32-039SR-65/US-431 WideningThis project has been adjusted to add $2,512,000 in federal NHPP funds in FY16. The request was made directly to FHWA by TDOT.12/01/2015
2014-0052010-79-005City of Lebanon 3R Improvement Program (Grouping)Project adjusted to add $8,214 (federal share) Local STP funds in FY 2014 to reflect the correct allocation amount provided by TDOT.2/03/2014
2016-0362010-79-005City of Lebanon 3R Improvement Program (Grouping)This project is being adjusted to add $334,768 (federal) in L-STP funds allocated to the City of Lebanon for FY 2016 through TDOT's Small Cities Allocation Program.8/31/2016
2016-0072006-014New Shackle Island Road (SR-258) - Phase 1This project was adjusted to add $653,200 (federal) in FY16 U-STP funds from TIP# 2002-028. Additionally, $140,000 (federal) in FY14 U-STP funds originally to be used for ROW/UTILITIES was added to FY16 CONST funding.12/17/2015
2015-0122015-89-062TDOT Help Truck ExpansionThis project is being adjusted to break out an extra funding line to show funding amount intended for acquisition of capital for this project (purchase of additional trucks for program). This action was necessitated by FHWA as part of the Buy America partial waiver process. Overall project cost does not change.4/14/2015
2015-0102015-66-063Nolensville Elementary School - Phase 2This project is being adjusted to correct the amount of PE-N funding available. Funding has been adjusted from $6,000 (federal) to $7,000 (federal) in SRTS funds.2/11/2015
2016-0322015-66-066Franklin/Cool Springs Bike Share ProgramThis project is being adjusted to convert $1,185,200 (federal) in FY15 U-ALT funds to FY17 U-RSV funds. Additionally, $262,253 (federal) in FY17 U-ALT funding is being shifted to FY16.8/15/2016
2016-0332015-56-067Gallatin Citywide Sidewalk Improvements - Phase 1This project was adjusted to add PE-N and ROW as eligible phases of project work.8/15/2016
2016-0292015-66-071Nolensville Small Town ConnectionsThis project is being adjusted to add $204,449 (federal) in U-ALT funds shifted from TIP# 2015-66-066 for increased ROW and CONST costs.8/15/2016
2016-0202015-56-074SR-41/US-31W Sidewalk/Bike Lane ProjectThis project is being adjusted to edit the project description, as the design will be 10 feet wide rather than 8 feet wide.3/12/2016
2016-0222015-69-076I-40 Truck Climbing LaneApril 2016 Adjustment to move NHPP funds to 2017. 
2016-0392015-17-217Berry Hill ITS Traffic Signal Coordination ProjectThis project is being adjusted to add PE-N as an eligible type of work in FY16. There is no change to project funding.9/02/2016
2016-0182015-17-218Goodlettsville Traffic Flow Improvements & Traffic Signal Upgrades (Phase 2)This project is being adjusted to redesignate eligible work phases on each FY line of funding in order for TDOT to facilitate fund obligation. There are no changes to project funding.3/12/2016
2016-0342016-212-224Main Street (SR-6/US-31N) and Donald F. Ephlin Parkway Signage & LandscapingThis project is being adjusted to add $24,500 in committed local funds for construction in FY16.8/15/2016
2016-0382016-212-224Main Street (SR-6/US-31N) and Donald F. Ephlin Parkway Signage & LandscapingThis project is being adjusted to add $10,493 (federal) in ENH (Roadscapes) funds allocated to the City of Columbia in FY16 and to move $24,500 in LOCAL funds to a separate FY16 line.8/31/2016
2016-0252016-23-225SR-166 at SR-6 InterchangeThis project was adjusted to decrease FY16 HSIP funds by $22,050 (federal) and to increase FY16 NHPP funds by $1,320,000 (federal). 5/27/2016