2013-004 | Project modified to shift $5,000 from PE-D to PE-N and change the funding split for PE-D and ROW & CONST phases from 100% Federal to 80% federal and 20% Local in response to MAP-21 requirements. The total project cost remains the same. | 2/06/2013 |
2013-036 | Project modified to shift $85,000 from ROW/CONST to PE-Design, shift $150,000 to PE-ROW and shift $236,000 at 100% federal for CONST to match amounts on revised contract with TDOT. A portion of the project intended for construction of pedestrian signal and crosswalk needs has been identified as eligible for 100% CMAQ funding. The total project cost remains the same. | 7/30/2013 |