2012-031 | The modifications adds Preliminary Engineering NEPA phase by shifting $51,200 (federal share) from to PE-Design. The total project cost remains the same. | 9/17/2012 |
2013-047 | Project modified to shift funds from PE NEPA to PE Design ($17,440 federal) and to Construction ($13,250 federal). The total project cost remains the same. | 12/02/2013 |