Transportation Improvement Program for FYs 2011-2015

Map

Program Summary

12/15/2010 12/15/2010 through 9/30/2015
269 11/29/2012
$1,214,662,396.25 Felix Castrodad at (615) 862-7157, castrodad@nashvillempo.org

Project List

Search for projects by keyword:     View Map  | Share

269 projects meet the search criteria:

TIP ID#Project NameImprovementLocationLead AgencyTotal Cost
2002-028Rockland Road/Imperial BoulevardMNew RoadSumner CountyHendersonville$12,624,690.00
2002-029Walton Ferry Road at West Main Street Re-Alignment - Phase 1MIntersectionSumner CountyHendersonville$12,565,325.00
2002-032Franklin Traffic Operations CenterMITSWilliamson CountyFranklin$1,397,135.00
2002-03821st Avenue Area SidewalksMSidewalksDavidson CountyMetro Nashville$708,750.00
2004-001Arterial CCTVMITSDavidson CountyMetro Nashville$1,381,875.00
2004-004Increased Guidance for Improved MobilityMSignage/WayfindingDavidson CountyMetro Nashville$600,000.00
2004-005Jefferson StreetMIntersectionDavidson CountyMetro Nashville$1,402,010.00
2004-007Traffic Management CenterMITSDavidson CountyMetro Nashville$1,120,000.00
2004-008Traffic Signal Communication Provision and UpgradeMITSDavidson CountyMetro Nashville$1,700,000.00
2004-009Wayfinding Sign ProgramMITSDavidson CountyMetro Nashville$1,725,250.00
Show # of items:

Reports & Tables

Report Name Description
Custom Project List Report Print or export a detailed list of all or selected projects
Project Information Sheets Print or export detailed information about individual projects
Funding Summary by Program Year and Grant Source View current balances of programmed funds by year and grant
Request another type of report Send us your request

List of Amendments

Amendment #TIP ID#ProjectActionMPO AdoptionTDOTFederal
2013-0382002-032Franklin Traffic Operations CenterThe amendment carries forward $160,000 (federal share) that was programmed in the previous FYs 2008-2011 TIP for this project.6/19/20137/11/20137/25/2013
2013-0352004-005Jefferson StreetProject amended to reduce the scope of the project from 5 to 2 intersections due to limited funds. The total project cost remains the same.6/19/20137/11/20137/25/2013
2011-0192004-008Traffic Signal Communication Provision and UpgradeExisting project in the 2011-15 TIP. Moved PE funds to construction and programmed construction phase funds from the U-STP reserve in accordance with Programming Policy # 9 of the FY 2011-15 TIP.7/20/20117/25/20117/28/2011
2011-0032004-020SR-109 @ Kirby DriveAdd L-STP funds for construction to cover for construction cost increases.5/04/20115/06/20115/24/2011
2013-0292004-022SR-76 SidewalksProject amended to program U-STP funds from the reserve for Construction in accordance with Programming Policy #9 of the FY 2011-15 TIP. Additionally, TDOT is providing the 20% match for the L-STP and U-STP funds.6/19/20137/11/20137/25/2013
2012-0582004-022SR-76 SidewalksThe amendment shifts $187,916 (federal share) of White House L-STP funds from TIP project 2011-54-156 – Tyree Springs Rd/ S. Palmers Chapel Intersection Improvements to Preliminary Engineering and Construction. Also, the fiscal year for all phases has been shifted to 2013.6/20/20127/06/20127/24/2012
2013-0202004-051SR-247 (Duplex Road)The amendment adds $177,780 in Local STP funds to FY 2013 for PE Final Design. The additional funds being added to this project are the balance of Spring Hill’s L-STP funds allocation not yet programmed in the TIP.3/20/20135/15/20135/22/2013
2011-0232004-058SR-253 (Concord Road)Project amended to add Surface Transportation Program (STP) funds for construction in FY 20129/21/20119/27/201110/11/2011
2012-0042004-066I-65/I-24The amendment adds Interstate Maintenance (IM) and Interstate Maintenance Discretionary (IMD) funds to FY 2012 for construction and adds the construction of noise barrier walls to the scope of work.12/14/201112/29/20111/04/2012
2011-0252006-013Concord Road (SR-253)Project amended to add Local funds for Preliminary Engineering and Right-of-Way. U-STP funds were programmed for Construction in FY 20129/21/20119/27/201110/11/2011
2012-0432006-014New Shackle Island Road (SR-258) - Phase 1Unutilized Preliminary Engineering funds shifted to Right-of-Way/Utilities phase and programmed in FY 2012. U-STP funds programmed from the reserve for Construction in accordance with Programming Policy # 9 of the FY 2011-15 TIP.6/20/20127/06/20127/24/2012
2012-0652006-113Bus Seat GuaranteeThe amendment adds a total of $240,000 in Congestion Mitigation and Air Quality (CMAQ) fund to the project in FY2012. The funds were not obligated or carried forward to the FY 2011-15 TIP and need to be added to the TIP.6/20/20127/06/20127/24/2012
2012-0482006-304Jefferson Springs Greenway ExtensionThe amendment removes Enhancement funding from the project as the grant was rescinded from TDOT. The HPP funding remains programmed on this project.6/20/20127/06/20127/24/2012
2013-0282006-408SR-6/ US-31/ Franklin Road WideningProject amended to shift the fiscal year for the utilities phase from 2012 to 2013. Additionally, $2,880,000 (federal share) in Surface Transportation Program (STP) funds were added for utilities work.6/19/20137/11/20137/25/2013
2011-0222006-408SR-6/ US-31/ Franklin Road WideningProject amended to add Surface Transportation Program (STP) funds for Utilities phase in FY 2012.9/21/20119/27/201110/11/2011
2011-0212006-416I-65/SR-109 Prop/SR-41Project amended to add additional National Highway System (NHS) funds for ROW in FY 20129/21/20119/27/201110/11/2011
2012-0552006-416I-65/SR-109 Prop/SR-41The amendment added additional State Surface Transportation Program (STP)and National Highway System (NHS) funding to fund ROW and Utilities in fiscal year 2012.6/20/20127/02/20127/03/2012
2012-0392006-417I-65 WideningInterstate Maintenance funds added for Right-of-Way and Utilities in FY 2012.3/21/20123/28/20124/06/2012
2011-0082008-14-030Various intersection improvements (FAU routes)Program construction funds for the project previously in the U-STP Reserve (U-RSV)4/22/20114/26/20115/16/2011
2013-0012008-15-046Project Administration for Grant ProgramsProject amended to add $165,600 (federal share) in FTA 5307 funds in FY13 and $60,000 (federal share) in FY14. Additional funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2012-0682008-15-048Service and Support Vehicles and EquipmentThe amendment adds $583,254 (federal share) in FTA’s Urbanized Area Formula (5307) funds to the project in FY2012. The funds are being shifted from TIP project 2008-85-091 – Commuter Rail Capitalization and Preventative Maintenance (RTA).6/20/20128/10/20128/29/2012
2012-0232008-15-049MTA - Administration Building Rehabilitation (Nestor)The amendment adds Federal Transit Administration’s State of Good Repair 5307 funds that need to be included in the TIP12/14/2011  
2013-0022008-15-052ACCESSRIDE BusesThe amendment adds a total of $1,660,000 in Local funds in FY 2013 and $1,100,000 in FY 2014.3/20/20134/16/20135/08/2013
2012-0822008-15-054Bus Purchase and ReplacementProject amended to add a total of $3,500,000 in local funds to FY 2013 for the replacement and/or expansion fixed route buses. Additionally, $3,043,200 (federal share) in FTA 5307 funds are being added to FY 2013. The 5307 funds were awarded to MTA as part of FTA’s Clean Fuels Grant Program and are specifically for the purchase of new zero emissions electric buses and installation of an electric charging station at Riverfront Station in downtown Nashville.12/12/2012  
2013-0052008-15-054Bus Purchase and ReplacementThe amendment adds a total of $7,300,000 in Local funds in FY 2013. Additionally, the description has been updated to include the scope part of FTA’s Clean Fuels Grant awarded to MTA in September 2012.3/20/20134/16/20135/08/2013
2013-0362008-15-054Bus Purchase and ReplacementThe amendment programs $2,284,251 (federal share) in FTA 5309 in FY 2013 to the project. 6/19/20137/05/20137/15/2013
2012-0692008-17-021Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS)The amendment adds a total of $266,746 (federal share) to the project in FY 2012. The funds are being shifted from TIP project 2008-85-091 – Commuter Rail Capitalization and Preventative Maintenance (RTA).6/20/20128/10/20128/29/2012
2012-0782008-17-021Computer Aided Dispatch (CAD), Automatic Vehicle Location (AVL) & Intelligent Transportation System (ITS)Project amended to shift a total of $400,000 from FY 2012 and $1,000,000 from FY 2013 funds to TIP Project 2011-15-137 - Local Bus Service Preventative Maintenance and Capitalization (MTA). A total of $333,432 from FY 2012 is being shifted to project 2011-15-148 – Satellite Maintenance and Office Facility (Peterbilt).12/12/2012  
2012-0032008-19-001I-65The amendment changes the funding source from National Highway System (NHS) to Interstate Maintenance (IM) and adds additional funds. Also, the construction year was shifted down from FY 2014 to FY 2012.12/14/201112/29/20111/04/2012
2011-0012008-46-075Chaney Boulevard SidewalkThe amendment adds $365,460 (federal) to complete the project based on higher than expected engineering estimates. The additional funds are High Priority Project (HPP) funds associated with bicycle and pedestrian improvements for the City.4/22/20114/26/20115/16/2011
2011-0092008-54-033Gallatin Various Intersection Improvements Shift $30,000 in H-STP (Optional Safety Funds) from CONST to ROW in order to cover ROW cost increases.4/22/20114/26/20115/16/2011
2012-0312008-54-033Gallatin Various Intersection Improvements The amendment updates the project description to add a right turn lane on SR-25. Also, funding amounts for the Preliminary Engineering, Right-of-Way and Construction phases changed to reflect the addition of the turn lane including shifting $30,000 in H-STP (Optional Safety Funds) from construction to Right-of-Way. Work related to the signal is eligible for 100% federal funding. 3/21/20124/05/20124/18/2012
2012-0372008-56-082Lower Station Camp Creek Road Streetscape and Pavement Project (Greenway)U-STP funds added to the project for construction from MPO's Active Transportation Program award. 3/21/20124/05/20124/18/2012
2012-0162008-56-082Lower Station Camp Creek Road Streetscape and Pavement Project (Greenway)The amendment adds Transportation Enhancement (ENH) funds to construction for FY 2012.12/14/20111/18/20121/23/2012
2012-0282008-67-035Concord Road Signals$250,000 in U-STP funds programmed for construction in FY 2012.3/21/20124/05/20124/18/2012
2012-0662008-85-091Commuter Rail Capitalization and Preventative MaintenanceThe amendment shifts FTA 5307 funds not needed in FY 2012 to three MTA projects. A total of $1,250,000 (federal share) is being shifted as follows: $400,000 to TIP project 2011-15-137 – Local Bus Service Preventative Maintenance and Capitalization (MTA), $583,254 to TIP project 2008-15-048 – Service and Support Vehicles and Equipment (MTA), and $266,746 to TIP project 2008-17-021 – Computer Aided Dispatch, Automated Vehicle Locator & Intelligent Transportation System (MTA).6/20/20128/10/20128/29/2012
2012-0812008-85-091Commuter Rail Capitalization and Preventative MaintenanceProject amended to add a total of $698,920 in FTA 5307 funds to FY 2013 and a total of $698,920 in FTA 5307 funds to FY 2014. The additional funds are being shifted from TIP project 2009-85-018 – SE Corridor Express Bus Service Expansion (RTA).12/12/2012  
2012-0472008-85-093New Freedom Program (Grouping)The amendment adds a total of $225,302 to the project in FY 2012. The additional federal funds for this project come from the Federal Transit Administration’s New Freedom Program (5317)allocation.6/20/20128/10/20128/29/2012
2012-0722009-56-027Town Creek GreenwayThe amendments adds High Priority Project (HPP) funds in FY2012. Project development was divided into phases due to budget constraints. NEPA has been completed for the entire section. Phase 1 (Complete) From Triple Creek Park to Barton Dr.; Phase 2 (In Design) From Barton Dr. to Wilmore St.; Phase 3 (Planned) From Wilmore St. to Franklin St. (Farmers Market).9/19/201210/23/201211/19/2012
2012-0082009-56-027Town Creek GreenwayThe amendment adds Congestion Mitigation and Air Quality (CMAQ) funds awarded through TDOT’s statewide competition.12/14/20111/18/20121/23/2012
2012-0512009-84-033I-40Interstate Maintenance (IM) funds added in FY 2013 for construction.6/20/20127/02/20127/03/2012
2011-0102009-85-010Martha Station ConstructionInclude HPP funds associated with Park and Ride Intermodal Centers for Nashville/Middle Tennessee Commuter Rail that were inadvertently omitted from being carried forward from the FY 2008-11 TIP. 5/18/20115/23/20116/08/2011
2012-0262009-85-018SE Corridor Express Bus Service ExpansionThe amendment adds Congestion Mitigation and Air Quality (CMAQ) funds awarded to this project through TDOT’s statewide competition.12/14/20111/18/2012 
2012-0802009-85-018SE Corridor Express Bus Service ExpansionThe amendment shifts a total of $1,397,840 in FTA 5307 unobligated funds from fiscal years 2011, 2012, 2013 and 2014 to TIP project 2008-85-091 – Commuter Rail Capitalization and Preventative Maintenance (RTA).12/12/2012  
2012-0452010-79-005City of Lebanon 3R Improvement Program (Grouping)Add $147,500 in L-STP funds originally programmed for TIP project 2011-79-162 - Hartmann Drive Lighting.6/20/20127/06/20127/24/2012
2011-0162010-79-005City of Lebanon 3R Improvement Program (Grouping)Add un-programmed funds from Lebanon’s L-STP balance.6/15/20116/23/20116/30/2011
2012-0772011-15-137Local Bus Service Preventative Maintenance and Capitalization - MTAProject amended to add a total of $1,400,000 in FTA 5307 funds to FY 2013. The additional funds are being shifted from TIP project 2008-17-021-Computer Aided Dispatch, Automatic Vehicle Location & Intelligent Transportation System (MTA).12/12/2012  
2012-0672011-15-137Local Bus Service Preventative Maintenance and Capitalization - MTAThe amendment adds $400,000 (federal share) in FTA’s Urbanized Area Formula (5307) funds to the project in FY2012. The funds are being shifted from TIP project 2008-85-091 – Commuter Rail Capitalization and Preventative Maintenance (RTA).6/20/20128/10/20128/29/2012
2012-0792011-15-148New Satellite Maintenance and Office Facility (Peterbilt)Project amended to add additional FTA 5307 funds to FY 2013 and expands the project’s scope to add rehabilitation and renovation work. The additional funds are being shifted from TIP project 2008-17-021 – Computer Aided Dispatch, Automatic Vehicle Location & Intelligent Transportation System (MTA).12/12/2012  
2011-0112011-15-148New Satellite Maintenance and Office Facility (Peterbilt)Include Federal Transit Administration 5309 that were not originally included in the TIP. 5/18/20115/27/20116/01/2011
2012-0222011-15-148New Satellite Maintenance and Office Facility (Peterbilt)The amendment adds Federal Transit Administration’s State of Good Repair 5307 funds that need to be included in the TIP.12/14/2011  
2011-0282011-16-092Harding Place Sidewalk EnhancementProject amended to include additional Local and Enhancement funds and revise the project termini.9/21/20119/27/201110/11/2011
2012-0592011-16-092Harding Place Sidewalk EnhancementThe amendment adds $136,340 (federal share) in State Safety Improvement Program (SIP) funds for construction. Also, the enhancement funds figures for construction were adjusted to match the revised contract with TDOT.6/20/20127/06/20127/24/2012
2013-0402011-42-031Chaney Boulevard WideningThe amendment shifts $92,151 (federal share) to TIP# 2011-42-031 – Old Nashville Highway to cover cost overruns.9/18/201310/21/201311/04/2013
2012-0112011-42-061Weakley LaneThe amendment reduces the total project cost from $5.8 million to $500,000. Further review of the congestion along this route led to a modification of the scope. Minor improvements including adding a left turn lane into the Rutherford County Collection Center have seen significant improvements in traffic flow, and it is expected that these improvements will be adequate to address congestion on this route.12/14/20111/18/20121/23/2012
2012-0702011-42-143Bradyville Pike (SR-99) WideningThe amendment adds $436,480 (federal share) for Right-of-Way from State Surface Transportation Program (STP) funds to match the negotiated amounts in the contract with TDOT.9/19/201210/23/201211/19/2012
2011-0302011-45-1125307 Urban Capital for Rover Public Transit - Bus Replacement and/or expansionProject amended to add $441,379 in 5307 funds in FY 2011. The additional funds come from TIP project 2011-45-114 - 5307 Urban Capital for Rover Public Transit - Station/ Operations/ Admin/ Training Facility9/21/20119/28/201110/28/2011
2011-0292011-45-1145307 Urban capital Funding for Rover Public - Station/Operations/Admin/Training FacilityProject amended to shift $441,379 in FY 2011 5307 Construction funds to TIP project 2011-42-112: 5307 Urban Capital for Rover Public TRansit - Bus Replacement 9/21/20119/28/201110/28/2011
2012-0052011-510-017Airport Road RelocationThe amendment adds State Industrial Access (SIA) road program grant funds received from TDOT.12/14/20111/18/20121/23/2012
2012-0572011-54-156Tyree Springs (SR-258) / S Palmers Chapel Intersection ImprovementsThe amendment shifts $187,916 (federal share) to TIP project 2004-022 – SR-76 Sidewalks also for the City of White House and moves construction to fiscal year 2014. The City is reviewing project design alternatives and reviewing local funding alternatives to complete the project.6/20/20127/06/20127/24/2012
2013-0302011-65-016Local Bus Service Preventative Maintenance and Capitalization - FranklinProject amended to shift $100,000 (federal share) in FTA 5307 funds to a new TIP project: 2013-65-220 – Local Multimodal Transit Service Planning.6/19/20137/05/20137/15/2013
2011-0152011-72-107I-40This project is an existing project in the FY 2011-15 TIP. TDOT is adding Interstate Maintenance (IM) funds to FY 2011 Construction6/15/20116/23/20118/09/2011
2012-0382011-72-107I-40Interstate Maintenance funds added for PE - Final Design in FY 20123/21/20123/28/20124/06/2012
2011-0142011-76-035Cedar City Trail - Phase 5 (Bartons Creek South)Include Phase 6 which has received Enhancement funds and is being combined with Phase 5 already in the TIP. The City of Lebanon is using PE and the donation of ROW as soft match for the project. The Federal and Local shares for the project remain an 80/20 split. Construction Engineering Inspection (CEI) and TDOT Oversight fees are included in the Construction phase funds. 6/15/20116/23/20116/30/2011
2013-0212011-76-035Cedar City Trail - Phase 5 (Bartons Creek South)This is a project in the current TIP. The amendment adds remaining funds from previous phases 3 and 4 of the same project to Phase 5. Also, the project description has been revised to properly describe the alignment.3/20/20135/15/20135/22/2013
2011-0042011-85-125Expansion of Regional Bus ServicesRe-purpose $100,000 of expiring vanpool funding in FY 2011 to provide for the addition of bus services in 2011. Funding is 100% federal and does not require a state or local match. Funds expire in September 2011.4/22/20114/26/20115/16/2011
2012-0462011-85-147Job Access and Reverse Commute Program (Grouping)The amendment adds a total of $359,106 to the project in FY 2012. The additional federal funds for this project come from the Federal Transit Administration’s Job Access and Reverse Commute Program (5316) allocation.6/20/20128/10/20128/29/2012
2013-0372011-86-6666Regional Non-Motorized Projects with U-STPThe amendment revises the project description to add specificity about regional coordination of bicycle and pedestrian planning activities.6/19/20137/11/20137/25/2013
2013-0272011-89-9999Regional ITS & System Management Projects with U-STPThe amendment shifts programmed U-STP funds ($794,000 - federal share) to three new projects in the TIP that were awarded funds through the MPO’s ITS & System Operations Call-for-projects.3/20/20135/15/20135/22/2013
2013-019203Middle Tennessee BoulevardProject amended to shift $990,000 (federal share) in HPP funds from the Construction phase to fund Right-of-Way. Additionally, $354,172 (federal share) in un-programmed M-STP funds are being added to Construction to replace DEMO funds rescinded and $691,717 (federal share) are being added to cover updated cost estimates for Construction. 10/01/201310/21/201311/05/2013
2011-002223Fergus Road SidewalkThe amendment adds additional funds to complete the project based on updated cost estimates. Enhancement funds are being substituted for High Priority Project (HPP) funds associated with bicycle and pedestrian improvements for the City.4/22/20114/26/20115/16/2011
2012-020226Stones River Greenway ExtensionThe amendment consolidates unobligated and unspent funds from HPP’s TN-034 & TN-146 and additionally adds TN-018 as an additional (new) funding source.12/14/20111/18/20121/23/2012
2013-03999-New-14Old Nashville HwyThe amendment shifts $92,151 (federal share) from TIP# 2011-42-031 - Chaney Boulevard Widening to cover cost overruns.9/18/201310/21/201311/04/2013
2011-01899-New-23East Broadway (SR-6)The City of Gallatin requested and amendment to cover cost overruns in PE, ROW and CONST. Federal funds are being shifted from PE and ROW to CONST and the funding split is being changed to 80% Federal / 20% State. The City also requested moving funds from the reserve and program U-STP funds for Construction in accordance with Programming Policy #9 of the FY 2011-15 TIP.6/15/20116/23/20116/30/2011
2012-00999-New-29Hendersonville Closed Loop and Signal UpgradeThe amendment shifts unused obligated CMAQ funds from the PE phase to the CONST phase and moves CONST to FY2012.12/14/20111/18/20121/23/2012
2012-017AM-006Hurricane Creek GreenwayThe amendment adds High Priority Project (HPP) TN-018 for Alternative Transportation Systems, increases the federal amount for Enhancement (ENH) funds and lowers the Local match for CONST.12/14/20111/18/20121/23/2012
2012-040AM-018SR-109Construction was shifted from FY 2011 to FY 2013 and ROW funds in FY 2013 were increased by $7,650,000. 3/21/20123/28/20124/06/2012
2011-012AM-018SR-109Shift the ROW phase to FY 2013 and fund with NHS funds. CONST phase has been added to the project in FY 2011 and it is funded with HPP funds. 6/15/20116/23/20117/05/2011
2011-0072011-15-160Transit Asset Management Software UpgradeThe amendment adds this project to the TIP with $200,000 of FTA 5309 funding for Federal Bus and Bus Facility to upgrade and design special reports for analysis and ultimately improve the way their fleet and other transit assets are managed. 3/16/20115/27/20116/01/2011
2011-0052011-15-158Expansion of MTA Bus ServiceAdd project to FY 2011-15 TIP. TDOT has made available $40,000 to MTA in expiring CMAQ funds for ozone related projects. MTA would like to utilize this funding to provide some additional trips on existing services that are currently experiencing standing-room-only loads during peak travel times. This funding is 100% federal and does not require a state or local match. These funds expire in September 2011.4/22/20114/26/20115/16/2011
2011-0062011-15-159Broadway-West End Alternative AnalysisNew project for inclusion in the FY 2011-15 TIP. The MTA master plan identified the Broadway-West End corridor as an area to provide both increased levels of service such as BRT in the short-term, as well as look at providing higher capacity service in the future.4/22/20115/27/20116/01/2011
2011-0132011-62-161SR-397New project for inclusion in the FY 2011-15 TIP. State STP funds are being added for the widening of SR-397 (Mack Hatcher) in Williamson County.6/15/20116/23/20117/05/2011
2011-0172011-79-162Hartmann Drive LightingNew project for inclusion in the 2011-15 TIP. Funds for this project come from the Local Surface Transportation Program (L-STP) specifically allocated to the City of Lebanon. 6/15/20116/23/20116/30/2011
2012-0442011-79-162Hartmann Drive LightingFund the project with local dollars. The L-STP funds programmed for this project were shifted to TIP project 2010-79-005 - City of Lebanon 3R Improvement Projects Grouping.6/20/20127/06/20127/24/2012
2011-0202011-87-163Nashville Smartway Remote Travel Time Assessment for SR-840New project added to the TIP9/21/20119/27/201110/11/2011
2011-0242011-72-164I-40 WideningProject added to the TIP9/21/20119/27/201110/11/2011
2011-0262011-610-165Fairview 3R Improvement Projects GroupingProject added to the TIP9/21/20119/27/201110/11/2011
2013-0222011-610-165Fairview 3R Improvement Projects GroupingThe amendment adds $301,600 (federal share) in Local STP funds to FY 2013 for Construction phase. The additional funds added to this project are being shifted from Fairview’s TIP project #2012-61-175 – City Center Way Extension.3/20/20135/15/20135/22/2013
2011-0272011-16-166Warner Parks Trail Linkage ImprovementsProject added to the TIP9/21/20119/27/201110/11/2011
2012-0012012-62-167SR-248 WideningThe amendmenent adds the project to the TIP with State Surface Transportation Program (STP) funds.12/14/201112/29/20111/04/2012
2012-0022012-42-168SR-99 WideningThe amendment adds the project to the TIP with State Surface Transportation Program (STP) funds12/14/20111/18/20121/23/2012
2013-0412012-42-168SR-99 WideningThe amendment adds $120,000 (federal share) needed for PE-Design.9/18/201310/21/201311/04/2013
2012-0062012-51-169Gateway Drive ExtensionThe project received State Industrial Access (SIA) road program funds from TDOT. The amendment will add the project to the TIP to reflect the SIA grant funds.12/14/20111/18/20121/23/2012
2012-0072012-51-170Greenlea Boulevard ExtensionThe project received Local Interstate Connector (LIC) program funds from TDOT. The amendment will add the project to the TIP to reflect the LIC grant funds.12/14/20111/18/20121/23/2012
2012-0102012-56-171Sanders Ferry/ Drakes Creek Bike TrailThe project was amended to add Congestion Mitigation and Air Quality (CMAQ) funds that were awarded to this project through TDOT’s statewide competition.12/14/20111/18/20121/23/2012
2012-0122012-44-172Sam Ridley Pkwy & Stonecrest Pkwy Intersection ImprovementsThe amendment adds the project to the TIP with Murfreesboro Urbanized Area Surface Transportation Program funds (M-STP) made available by the re-scoping of TIP project #2011-42-061 – Weakley Lane.12/14/20111/18/20121/23/2012
2012-0132012-47-173Smyrna Signal SystemThe amendment adds the project to the TIP with Murfreesboro Urbanized Area Surface Transportation Program funds (M-STP) made available by the rescoping of TIP project #2011-42-061 – Weakley Lane.12/14/20111/18/20121/23/2012
2012-0142012-44-174Almaville Road & Morton Lane Intersection ImprovementsThe amendment adds the project to the TIP with Murfreesboro Urbanized Area Surface Transportation Program funds (M-STP)made available by the re-scoping of TIP project #2011-42-061 – Weakley Lane.12/14/20111/18/20121/23/2012
2012-0182012-69-176Carter Cotton Gin Battlefield SiteThe amendment adds the project to the TIP with Transportation Enhancement funds awarded through TDOT’s statewide competition.12/14/20111/18/20121/23/2012
2012-0192012-66-177Tanyard Springs Connection Trail/ BridgeThe amendment adds the project to the TIP with Transportation Enhancement funds awarded through TDOT’s statewide competition.12/14/20111/18/20121/23/2012
2012-0212012-85-178Communicating Dynamic Alternative Transportation Options at Employer WorksitesThe amendment adds Congestion Mitigation and Air Quality (CMAQ) funds that were awarded to this project through TDOT’s statewide competition.12/14/20111/18/20121/23/2012
2012-0242012-15-179Express Bus Service to MadisonThe amendment adds Congestion Mitigation and Air Quality (CMAQ) funds awarded to this project through TDOT’s statewide competition.12/14/20111/18/2012 
2012-0252012-85-180NE Corridor Regional Express Bus ServiceThe amendment adds Congestion Mitigation and Air Quality (CMAQ) funds that were awarded to this project through TDOT’s statewide competition.12/14/20111/18/2012 
2012-0272012-69-181Timberland Park Improvements Phase IIIThe amendment adds the project to the TIP with National Scenic Byways Program (NSBP) funds.12/14/20111/18/20121/23/2012
2012-0292012-66-182Fairview Multimodal Connector - Phase 1Project added to the TIP with U-STP funding from MPO's Active Transportation Program award3/21/20124/05/20124/18/2012
2012-0302012-56-183Downtown Gallatin Streetscape - Phase 3Project added to the TIP with U-STP funds from MPO's Active Transportation Program award3/21/20124/05/20124/18/2012
2012-0322012-15-184East-West ConnectorProject added to the TIP3/21/20123/30/20124/12/2012
2012-0332012-16-185Music City MovesProject added to the TIP with U-STP funds from MPO's Active Transportation Program award. 3/21/20124/05/20124/18/2012
2012-0762012-16-185Music City MovesThe project was awarded U-STP funds through the MPO’s Active Transportation competition earlier this year with Metro Nashville as the sponsor. The proposed amendment re-awards the grant to Nashville MTA. 12/12/2012  
2012-0342012-76-186Mini Greenway Connector to Music City Star StationProject added to the TIP with U-STP funds from MPO's Active Transportation Program award. 3/21/20124/05/20124/18/2012
2012-0352012-66-187Small Town ConnectionsProject added to the TIP with U-STP funds from MPO's Active Transportation Program award. 3/21/20124/05/20124/18/2012
2012-0362012-26-188Spring Station Drive Multi-use TrailProject added to the TIP with U-STP funds from MPO's Active Transportation Program award. 3/21/20124/05/20124/18/2012
2012-0412012-66-189Thompson's Station Greenway - Phase 1Project added to the TIP with Transportation Enhancement (ENH) funds warded through a stewide competition program. 3/21/20124/05/20124/18/2012
2012-042232Gateway TrailThe project has been completed and was not carried forward to the FY 2011-15 TIP. FHWA is requiring that the underlying funding source be reinstated in the TIP to accomplish the federal project closure without showing a project deficit. The programmed amount covers actual remaining costs incurred. 3/21/20124/05/20124/18/2012
2012-0492012-56-190Smyrna Greenway Phase 1Project added to the TIP with High Priority Project (HPP) funds for Preliminary Engineering in FY 2012 and Construction in FY 2013.6/20/20127/06/20127/24/2012
2012-0502012-59-191Civil War Historic PreservationProject added to the TIP with funds coming from a congressional earmark for historic preservation involving a partnership of six counties consisting of Macon, Robertson, Smith, Sumner, Trousdale and Wilson. 6/20/20127/06/20127/24/2012
2012-0522012-87-192I-24 Smartway ExpansionProject added to the TIP with Interstate Maintenance funds for construction in FY 2013.6/20/20127/02/20127/03/2012
2012-0732012-87-192I-24 Smartway ExpansionThe amendment adds $6,300,000 (federal share) in Interstate Maintenance (IM) funds to the project due to an updated cost estimate.9/19/20129/21/201210/03/2012
2012-0532012-87-193I-65 ITSProject added to the TIP with Interstate Maintenance (IM)funds in FY 2013 for Preliminary Engineering NEPA and Preliminary Engineering Design6/20/20127/02/20127/03/2012
2012-0542012-42-194SR-266 (Jefferson Pike) WideningProject to the TIP with State Surface Transportation Program (STP) funds for Right-of-Way in FY 2013.6/20/20127/02/20127/03/2012
2012-0562012-56-195Highway 31W/ SR-41 Bike/Pedestrian ProjectThe amendment adds the project to the TIP with $360,000 (federal share) in Project added to the TIP with Nashville UZA Urban Surface Transportation Program (U-STP) funds for Construction awarded through the MPO’s Active Transportation Program (ATP) competition. Funds for this project were shifted from TIP project # 2011-86-6666 - Regional Non-Motorized Projects with U-STP.6/20/20127/06/20127/24/2012
2012-0602012-15-196Ticket Vending Machines and Smartcard ProgrammingProject added to the TIP with $392,000 (federal share) in U-STP funds for Implementation awarded through the MPO’s Mass Transit Program competition. Funds for this project are being shifted from TIP project # 2011-85-5555 - Regional Transit Projects with USTP6/20/20127/06/20127/24/2012
2012-0612012-15-197Real-time Arrival Mobile App DevelopmentProject added to the TIP with $56,000 (federal share) in U-STP funds for Implementation awarded through the MPO’s Mass Transit Program competition. Funds for this project are being shifted from TIP project # 2011-85-5555 - Regional Transit Projects with USTP6/20/20127/06/20127/24/2012
2012-0622012-35-198Springfield Park-n-Ride Directional and Identification SignageProject to the TIP with $1,200 (federal share) in U-STP funds for Construction awarded through the MPO’s Mass Transit Program competition. Funds for this project are being shifted from TIP project # 2011-85-5555 - Regional Transit Projects with U-STP.6/20/20127/06/20127/24/2012
2012-0632012-55-199Greensboro North Park-n-Ride in GallatinProject added to the TIP with $556,400 (federal share) in U-STP funds for Environmental, Land Acquisition and Construction awarded through the MPO’s Mass Transit Program competition. Funds for this project are being shifted from TIP project # 2011-85-5555 - Regional Transit Projects with U-STP.6/20/20127/06/20127/24/2012
2012-0642012-85-200Intelligent Real-time Ad Hoc RidesharingProject added to the TIP with $556,400 (federal share) in U-STP funds for Environmental, Land Acquisition and Construction awarded through the MPO’s Mass Transit Program competition. Funds for this project are being shifted from TIP project # 2011-85-5555 - Regional Transit Projects with U-STP.6/20/20127/06/20127/24/2012
2012-0712012-44-201SR-1 and SR-96 Intersection Grade SeparationThe project was in the previous TIP (#202) but not carried forward to the current TIP. The amendment adds the project to the TIP with National Highway System (NHS) funds for construction in 2013. Preliminary Engineering and Right-of-Way have been completed for this project.9/19/20129/21/201210/03/2012
2012-0742012-58-202Douglass-Clark House RestorationThe amendment adds the project to the TIP with $693,809 (federal share) in Transportation Enhancement funds for Construction awarded through the TDOT’s Transportation Enhancement Competition. The project is part of the Station Camp Greenway Master Plan.9/19/201210/23/201211/19/2012
2012-00752008-46-041Lytle Creek GreenwayThe project was in the FY 2008-11 TIP but not carried forward to the FY2011-15 TIP. The amendment adds the project to the TIP in order to be closed out.12/12/2012  
2013-0032013-15-203Charging StationsProject amended into the TIP with $24,000 (federal share) in FTA 5307 funds in FY13. Additional funds for this project come from FTA’s FY13 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0062013-89-204Northwest Corridor Transit StudyThe amendment adds the project to the TIP with $400,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0072013-89-205Positive Train Control TechnologyProject amended into the TIP with $600,000 (federal share) in FTA 5307 funds being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0082013-85-206Miscellaneous Support Equipment & Passenger AmenitiesThis is a new project for inclusion in the FY 2011-15 TIP. $100,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0092013-85-207Music City Star Passing SidingThis is a new project for inclusion in the FY 2011-15 TIP. $480,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0102013-85-208Music City Star Rail Replacement/ Track RehabThis is a new project for inclusion in the FY 2011-15 TIP. $2,560,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0112013-85-209Shore Power for Music City Star Riverfront StationThis is a new project for inclusion in the FY 2011-15 TIP. $40,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2012-0122013-85-210Stationary Fare Collection EquipmentThis is a new project for inclusion in the FY 2011-15 TIP. $1,040,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0132013-85-211Installation of Wi-Fi on Music City Star trainThis is a new project for inclusion in the FY 2011-15 TIP. $2,400 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0142013-85-212Purchase and/or Rehab Locomotive and Rail CarsThis is a new project for inclusion in the FY 2011-15 TIP. $252,721 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0152013-85-213Rehab/Renovate StationsThis is a new project for inclusion in the FY 2011-15 TIP. $80,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0162013-85-214Storage and Maintenance Yard for RailcarsThis is a new project for inclusion in the FY 2011-15 TIP. $80,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0172013-85-215Spare parts for stockNew project for inclusion in the FY 2011-15 TIP. $120,000 (federal share) in FTA 5307 funds are being programmed for this project. The funds for this project come from FTA’s FY 2013 apportionment of 5307 funds for the Nashville-Davidson Urbanized Area.3/20/20134/16/20135/08/2013
2013-0182013-45-2165309 (SGR) Bus ReplacementThis is a new project for inclusion in the FY 2011-15 TIP. $193,970 (federal share) in FTA 5309 funds are being programmed for this project. 3/20/20134/16/20135/08/2013
2013-0242013-87-217Regional Traffic Management Study and Signal Optimization PlanProject added to the TIP with $220,000 (federal share) in U-STP funds in FY 2013 and $86,000 (federal share) in FY 2014. The funds were awarded through the MPO’s ITS/ System Operations Program competition. Funds for this project are being shifted from TIP project #2011-89-9999 - Regional ITS & System Management Projects with U-STP.3/20/20135/15/20135/22/2013
2013-0252013-77-218SR-171 (Mt. Juliet Road) Traffic Adaptive Signal Control System Corridor Optimization ProjectThe amendment adds the project to the TIP with $468,000 (federal share) in U-STP funds in FY 2014. The funds were awarded through the MPO’s ITS/ System Operations Program competition. Funds for this project are being shifted from TIP project #2011-89-9999 - Regional ITS & System Management Projects with U-STP.3/13/20135/15/20135/22/2013
2013-0262013-67-219North Berry's Chapel Rd Intersection with Lynnwood Way ConnectorThe amendment adds the project to the TIP with $20,000 (federal share) in U-STP funds in FY 2013. The funds were awarded through the MPO’s ITS/ System Operations Program competition. Funds for this project are being shifted from TIP project #2011-89-9999 - Regional ITS & System Management Projects with U-STP.3/20/20135/15/20135/22/2013
2013-0312013-65-220Local Multimodal Transit Service PlanningNew project added to the FY 2011-15 TIP. The amendment adds the project to the TIP with $100,000 (federal share) in FTA 5307 funds from Franklin Transit Authority’s project: 2011-65-016 – Local Bus Service Preventative Maintenance and Capitalization.6/19/20137/05/20137/15/2013
2013-0322013-85-221Lowered Floor MinivansNew project added to the FY 2011-15 TIP. The amendment adds the project to the TIP with $158,274 (federal share) in FTA 5310 (Transportation for Elderly Persons and Persons with Disabilities) awarded through TDOT.6/19/20137/05/20137/15/2013
2013-0332013-85-222Cutaway MinibusNew project added to the FY 2011-15 TIP. The amendment adds the project to the TIP with $31,726 (federal share) in FTA 5310 (Transportation for Elderly Persons and Persons with Disabilities) awarded through TDOT.6/19/20137/05/20137/15/2013
2013-0342013-85-223Passenger VanNew project added to the FY 2011-15 TIP. The amendment adds the project to the TIP with $22,499 (federal share) in FTA 5310 (Transportation for Elderly Persons and Persons with Disabilities) awarded through TDOT.6/19/20137/05/20137/15/2013
2013-0422004-056SR-99/ New Salem Rd Widening (Cason Ln to SR-96)Project added to the TIP. The project was part of the previous TIP (FYs 2008-2011) but not carried forward to the current TIP. The amendment adds $360,000 (federal share) needed for PE-Design. 9/18/201310/21/201311/04/2013

List of Administrative Modifications

Adjustment #TIP ID#ProjectActionMPO Approval
2011-0212002-029Walton Ferry Road at West Main Street Re-Alignment - Phase 1Project adjusted to shift $1,359,010 (federal) from 2012 construction to FY 2011 Right-of-Way. The total project cost remained the same.7/25/2011
2013-0252002-029Walton Ferry Road at West Main Street Re-Alignment - Phase 1Project modified to shift $184,800 (federal share) from CONST to PE in FY 2013 to cover a cost overrun. The total project cost remains the same.4/04/2013
2011-0032004-022SR-76 SidewalksShift PE funding source from Local STP to State STP 4/27/2011
2011-0272004-066I-65/I-24Project adjusted to add $270,000 (federal) for the Utilities phase in FY 2011.8/10/2011
2012-0172004-066I-65/I-24Project modified to reduce IM funds for CONST by $18,105,300 (federal share), add $15,676,800 (federal share) in NHS funds for CONST, and increase State funds by $520,833 for CONST.5/25/2012
2012-0212004-066I-65/I-24Project modified to increase Interstate Maintenance (IM) funds for construction in FY2012 by $3,341,700 (federal share) and increase National Highway System (NHS) funds for construction in FY 2012 by $3,296,400 (federal share).6/25/2012
2011-0022006-124Gateway BoulevardAdd previous phase (PE) and shift $112,000 (federal) in U-STP funds from ROW to PE to finalize design changes associated with ROW acquisition completion4/25/2011
2013-0272006-124Gateway BoulevardProject modified to shift $75,000 (federal share) from CONST to PE for design modifications during construction and PE phase close-out. The total project cost remained the same. 5/21/2013
2013-0442006-408SR-6/ US-31/ Franklin Road WideningProject modified to change the FY for Utilities work from 2013 to 2014. Additionally, the funding source for Utilities has been changed to National Highway Performance Program (NHPP). 8/29/2013
2013-0262006-411ITS-VariousProject modified to change the fiscal year for MAINTENANCE from 2014 to FY 2013. No changes to the funding amounts are taking place and the total project cost remains the same. 4/22/2013
2013-0062006-411ITS-VariousProject modified to change the fiscal year for MAINTENANCE from 2013 to FY 2014. No changes to the funding amounts are taking place and the total project cost remains the same. 2/19/2013
2012-0352006-411ITS-VariousProject modified to change FY 2012 OPERATIONS work to FY 2013 CONSTRUCTION and change the funding code from IM to NHPP. No changes made to the funding amounts and the total project cost remains the same. 12/06/2012
2012-0332006-411ITS-VariousProject modified to change the funding codes for FYs 2013 and 2014 from IM and NHS to NHPP (National Highway Performance Program) to reflect new codes part of the MAP-21 transportation bill. No changes to the funding amounts are taking place and the total project cost remains the same.10/12/2012
2011-0162006-411ITS-VariousProject adjusted to add $390,001 (federal) for Operations in FYs 2012 and 2013 and $292,500 (federal) in FY 2014. 6/24/2011
2012-0192006-411ITS-VariousProject modified to change the funding source for Operations in FY 2013 & FY 2014 from Interstate Maintenance (IM) to National Highway System (NHS). The total project cost remains the same.6/25/2012
2013-0032006-416I-65/SR-109 Prop/SR-41Project modified to change the FY for ROW from 2012 to 2013 and change the funding code for ROW from National Highway System (NHS) to National Highway Performance Program (NHPP) to reflect new codes part of the MAP-21 transportation bill. The total project cost remains the same.1/17/2013
2011-0082008-14-0593rd Avenue and Union StreetProject modified to add previous phases (PE-N, PE-D and ROW). The adjustment also shifts $320,000 (federal) in HPP funds from CONST to PE-N in FY 2011, $400,000 to ROW in FY 2011, and $480,000 to PE-D in FY 2012. CONST is also pushed out to FY 2013. The total project cost remains the same.5/20/2011
2011-0102008-19-001I-65Project adjusted to move construction from FY 2011 to FY 2014.6/09/2011
2012-0232008-45-0905307 Urban Capital for Rover Public Transit - EquipmentProject modified to include capitalized maintenance in the description and shift $240,000 in total funds for this purpose. No new funds were added and the total project amount remains unchanged.7/12/2012
2011-0042008-56-082Lower Station Camp Creek Road Streetscape and Pavement Project (Greenway)Add $424,920 in Enhancement funds to FY 2011 from TIP #2008-89-087 - Transportation Enhancement Projects Grouping4/27/2011
2013-0372008-74-061Interchange LightingProject modified to shift a total of $49,219 ($3,150 PE-D and $46,069 CONST) to TIP project #2010-79-005 Lebanon 3R Improvement Program Grouping. The funds are needed to complete work programmed as part of the City's 3R Improvement projects. 8/07/2013
2011-0332008-76-024Town Center TrailChange project's name to Town Center Trail to better reflect its focus on the connection between the residential areas along West Division Street and the Mt. Juliet Town Center which includes the Music City Star Transit Station.10/18/2011
2011-0222008-84-012Spot Safety Improvement ProgramProject adjusted to add $320,000 (federal) in FY 20117/26/2011
2011-0072008-84-012Spot Safety Improvement ProgramProject adjusted to add $104,000 (federal) to FY 2011.4/29/2011
2012-0242008-84-012Spot Safety Improvement ProgramProject modified to increase State Surface Transportation Program (STP) funds for CONST in FY 2012 by $160,000 (federal share).7/16/2012
2012-0182008-84-012Spot Safety Improvement ProgramProject modified to increase Surface Transportation Program (STP) funds for construction in FY 2012 by $240,000 (federal share).6/25/2012
2012-0012008-84-012Spot Safety Improvement ProgramThe project was modified to add $120,000 (federal) to FY 2012.1/06/2012
2012-0162008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project was modified to add $900,000 (federal) to FY 2012.5/21/2012
2012-0272008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project modified to add $900,000 (federal share) to FY 2012.7/31/2012
2012-0302008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project modified to add $900,000 (federal) to FY 2012.9/06/2012
2011-0262008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project adjusted to add $270,000 (federal) in FY 2011.8/09/2011
2011-0052008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project adjusted to add $900,000 (federal) to FY 2011.4/29/2011
2013-0352008-84-013Safety Program: Highway Hazard Elimination (Grouping)Project modified to add $450,000 (federal share) and $50,000 in State match in FY 2013.7/02/2013
2013-0092008-88-002Bridge Repair and Replacement: Local Program (Grouping)Project modified to change the funding source from BRR-L to STP in fiscal years 2013 and 2014 with the appropriate 20% non-federal funding match change. The total project cost remains the same.2/19/2013
2012-0022008-88-002Bridge Repair and Replacement: Local Program (Grouping)The project was modified to add $800,000 (federal) to FY 2012.1/06/2012
2012-0062008-88-002Bridge Repair and Replacement: Local Program (Grouping)Modified to add $1,600,000 (federal) to FY 20121/23/2012
2011-0232008-88-011Bridge Repair and Replacement: State Program (Grouping)Project adjusted to add $2,947,099 (federal) in FY 2011.7/26/2011
2011-0302008-88-011Bridge Repair and Replacement: State Program (Grouping)Project adjusted to add $7,520,000 (federal) to FY 20118/18/2011
2013-0112008-88-011Bridge Repair and Replacement: State Program (Grouping)Project modified to change the funding source from BRR-S to NHPP in fiscal years 2013 and 2014 to reflect new codes part of the MAP-21 transportation bill. Additionally, $3,200,000 (federal share) is being added in STP funding in fiscal year 2013 and $3,2000,000 (federal share) in fiscal year 2014.2/19/2013
2013-0412008-88-011Bridge Repair and Replacement: State Program (Grouping)Project modified to remove FY 2013 NHPP funding ($3,200,000 federal share).8/29/2013
2013-0102008-89-003Bridge Repair and Replacement: Local Program Cost Overruns (Grouping)Project modified to delete funding for fiscal years 2013 and 2014.2/19/2013
2013-0122008-89-004Bridge Repair and Replacement: State Program Cost Overruns (Grouping)Project modified to delete funding from fiscal years 2013 and 2014.2/19/2013
2011-0282008-89-004Bridge Repair and Replacement: State Program Cost Overruns (Grouping)Project adjusted to add $9,760,000 (federal) in FY 2011.8/11/2011
2011-0292008-89-005Surface Transportation Program Cost Overruns (Grouping)Project adjusted to add $1,920,000 (federal) to FY 2011.8/12/2011
2011-0372008-89-005Surface Transportation Program Cost Overruns (Grouping)The modification adds $1,600,000 (federal) to FY 201212/27/2011
2013-0132008-89-005Surface Transportation Program Cost Overruns (Grouping)Project modified to add $1,200,000 (federal share) in STP funds to fiscal year 2013.2/19/2013
2013-0142008-89-007National Highway System Program Cost Overruns (Grouping)Project modified to delete funding for fiscal years 2013 and 2014.2/19/2013
2012-0112008-89-007National Highway System Program Cost Overruns (Grouping)Project modified to add $1,000,000 in National Highway System (NHS) funds to FY 20124/02/2012
2011-0112008-89-007National Highway System Program Cost Overruns (Grouping)Project adjusted to remove work phases and funding for FY 2011.6/09/2011
2011-0122008-89-008National Highway System Program Cost Overruns <30% (Grouping)Project adjusted to remove work phases and funding for FY 2011.6/09/2011
2013-0152008-89-008National Highway System Program Cost Overruns <30% (Grouping)Project modified to delete funding for fiscal years 2013 and 2014.2/19/2013
2013-0162008-89-009National Highway Performance Program Cost Overruns (Grouping)Project modified to revise the project's description. No changes in the funding amounts has taken place and the total project cost remains unchanged.2/19/2013
2012-0362008-89-009National Highway Performance Program Cost Overruns (Grouping)Project modified to change the funding codes for FYs 2013 and 2014 from IM to NHPP to reflect new codes part of the MAP-21 transportation bill. Additionally, $1,080,000 (federal share) in NHPP funds were added to FY 2013.12/10/2012
2013-0422008-89-009National Highway Performance Program Cost Overruns (Grouping)Project modified to remove FY 2013 NHPP funding ($1,260,000 federal share)8/29/2013
2012-0122008-89-009National Highway Performance Program Cost Overruns (Grouping)Project modified to add a total of $6,500,000 in Interstate Maintenance funds to FY 20124/02/2012
2013-0172008-89-010Interstate Maintenance Program Cost Overruns <30% (Grouping)Project modified to delete funding for fiscal years 2013 and 2014.2/19/2013
2013-0182008-89-014National Highway System 3R ImprovementsProject modified to revise the name and termini and add $1,000,000 (federal share) to FY 2013.2/19/2013
2013-0012008-89-014National Highway System 3R ImprovementsProject modified to change the funding codes for FYs 2013 and 2014 from Interstate Maintenance (IM) to National Highway Performance Program (NHPP) to reflect new codes part of the MAP-21 transportation bill. Additionally, $5,355,000 (federal) in NHPP funds are being added to FY 2013.1/10/2013
2013-0282008-89-014National Highway System 3R ImprovementsProject modified to reduce the FY 2013 amount by $4,400,000 (federal share).5/29/2013
2013-0402008-89-014National Highway System 3R ImprovementsProject modified to add $9,600,000 (federal share) to FY 2013.8/29/2013
2012-0132008-89-014National Highway System 3R ImprovementsProject modified to add a total of $350,000 in Interstate Maintenance funds to FY 20124/02/2012
2012-0282008-89-014National Highway System 3R ImprovementsProject modified to add $4,680,000 (federal share) to FY 2012.7/31/2012
2011-0252008-89-014National Highway System 3R ImprovementsProject adjusted to add $6,300,000 (federal) in FY 20118/09/2011
2011-0352008-89-014National Highway System 3R ImprovementsProject adjusted to add $166,500 (federal) to FY 2012.11/11/2011
2011-0362008-89-015State Route 3R ImprovementsProject adjusted to add $800,000 (federal) to FY 2012.11/11/2011
2011-0242008-89-015State Route 3R ImprovementsProject adjusted to add $1,440,000 (federal) to FY 2011.7/26/2011
2011-0062008-89-015State Route 3R ImprovementsProject adjusted to add $1,600,000 (federal) to FY 2011.4/29/2011
2012-0082008-89-015State Route 3R ImprovementsProject modified to add $5,439,568 (federal) to FY 2012.3/08/2012
2012-0032008-89-015State Route 3R ImprovementsThe project was modified to add $5,600,000 (federal) to FY 2012.1/06/2012
2013-0022008-89-015State Route 3R ImprovementsProject modified to change the funding codes for FYs 2013 from Surface Transportation Program (STP) to National Highway Performance Program (NHPP) to reflect new codes part of the MAP-21 transportation bill. Additionally, $6,360,000 (federal) in STP funds are being added to FY 2013 and $6,400,00 (federal share) in NHPP funds are being added to FY 2014.1/10/2013
2013-0192008-89-015State Route 3R ImprovementsProject modified to delete NHPP funding for fiscal year 2013.2/19/2013
2012-0322008-89-087Transportation Enhancement Program (Grouping)The modification shifts $500,000 (federal share) from FY 2013 to FY 2012 associated with the Eastern Flank Battlefield Access Improvement project in Franklin, TN. The total project cost remains the same9/20/2012
2011-0042008-89-087Transportation Enhancement Program (Grouping)Transfer $424,920 in total Enhancement funds to TIP #2008-56-082 - Lower Station Camp Creek Road Greenway4/27/2011
2012-0202008-89-091Freeway Safety Service Patrol Program (Grouping)Project modified to change the funding source for Operations in FY 2013 and FY 2014 from Surface Transportation Program (STP) to National Highway System (NHS). The total project cost remains the same.6/25/2012
2013-0202008-89-091Freeway Safety Service Patrol Program (Grouping)Project modified to change the funding source for fiscal years 2013 and 2014 from NHS to NHPP to reflect new codes part of the MAP-21 transportation bill. No changes to the funding amounts are taking place and the total project cost remains the same.2/19/2013
2012-0262009-56-027Town Creek GreenwayProject modified to revise title to remove "Phase 2"; Revise the project description to change "Smith St" to "Farmers Market"; Revise PE line from "PE-D" to "PE"; Shift $96,000 (federal share) from CONST to PE and revise the Local match; Shift $221,600 (federal share) from CONST to ROW and revise the Local match; Reduce the federal share for CONST by $317,600 to reflect funds transferred to PE and ROW and revise the Local match.7/26/2012
2013-0052009-67-026Franklin ITS InfrastructureProject modified to revise the description to specify the expansion of the ITS network capabilities and add adaptive signal control. The modification does not change any funding amounts and the project cost remains the same.2/12/2013
2013-0072009-84-033I-40Project modified to change the fiscal year for CONST from 2013 to FY 2014 and change the funding source from IM to NHPP to reflect new codes part of the MAP-21 transportation bill. Additionally, ROW has bee added in FY 2013 with $472,500 (federal share) in NHPP funds. 2/19/2013
2011-0132009-84-033I-40Project adjusted to change the FY for PE from 2011 to 2012.6/09/2011
2012-0052009-88-032Bridge Bond Program (Grouping)Modified to add $6,000,000 to FY 20121/23/2012
2011-0342010-710-006SR-141Project adjusted to add $ 4,080,000 (federal) for Construction in FY 201211/07/2011
2013-0382010-79-005City of Lebanon 3R Improvement Program (Grouping)Project modified to add a total of $42,219 to PE-D/ CONST. The additional funds are being shifted from to TIP project #2008-74-061 Interchange Lighting. 8/07/2013
2011-0142011-12-109I-440Project adjusted to change the funding source from IM to STP for both work phases. The funding split for both work phases has also changed from 90/10 to 80/20.6/09/2011
2012-0292011-15-117Enhanced Transit Service along West End Corridor - CapitalThis project was originally changed in March 2012 to a 100% CMAQ funds. However, the original 2010 proposal budget used to evaluate and score the proposal identified a 20% Local match. After further review, TDOT determined that the funding needs to be changed to a 80% Federal and 20% Local split. The modification adds the Local match back to the project and increases the total cost for each phase to reflect the 80/20 split for all years of the project.8/20/2012
2012-0092011-15-117Enhanced Transit Service along West End Corridor - CapitalThe project is eligible for a 100% CMAQ funds. The modification eliminates the Local match and changes the total cost for each phase to reflect the 100% federal funding for all years of the project.3/09/2012
2013-0362011-16-119Goodlettsville Bicycle/Pedestrian Plan - Greenway ConnectorsProject modified to shift $85,000 from ROW/CONST to PE-Design, shift $150,000 to PE-ROW and shift $236,000 at 100% federal for CONST to match amounts on revised contract with TDOT. A portion of the project intended for construction of pedestrian signal and crosswalk needs has been identified as eligible for 100% CMAQ funding. The total project cost remains the same.7/30/2013
2013-0042011-16-119Goodlettsville Bicycle/Pedestrian Plan - Greenway ConnectorsProject modified to shift $5,000 from PE-D to PE-N and change the funding split for PE-D and ROW & CONST phases from 100% Federal to 80% federal and 20% Local in response to MAP-21 requirements. The total project cost remains the same.2/06/2013
2013-0292011-17-019Caldwell Drive/Indian Hills Pedestrian ControlProject modified to shift funds between phases to reflect update cost estimates including CEI costs. The total project cost remains the same. 5/31/2013
2011-0392011-17-019Caldwell Drive/Indian Hills Pedestrian Control*This modification updates the FY and amounts for the PE NEPA, PE Final Design and Construction phases. The total project cost remained the same.12/28/2011
2011-0172011-41-144Cherry Lane Extension with SR-840 InterchangeProject adjusted to subdivide the PE phase to include PE-NEPA by shifting $1,353,600 (federal) from PE-Design. Additionally, $240,000 (federal) from PE are being shifted to TIP project # 2011-42-142 - Thompson Lane Widening to supplement funding for ROW in FY 2013. 6/30/2011
2011-0182011-42-142Thompson Lane (SR-268) WideningProject adjusted to subdivide the PE phase to include PE-NEPA by shifting $1,600,000 (federal) from PE-Design. Additionally, $240,000 (federal) are being added from TIP project # 2011-41-144 - Cherry Lane Extension w/SR-840 Interchange to ROW in FY 2013. 6/30/2011
2012-0042011-42-143Bradyville Pike (SR-99) WideningThe project was modified to subdivide the PE phase to include PE-NEPA in FY2012 by shifting $88,704 (federal) from PE-Design. Also, the fiscal year for PE-D was changed to 2012.1/10/2012
2012-0252011-42-143Bradyville Pike (SR-99) WideningProject modified to shift Murfreesboro Urbanized Area STP funds between project phases to match the negotiated amounts in the contract with TDOT. The total amount of programmed funds for the project remained the same.7/19/2012
2011-0192011-45-1145307 Urban capital Funding for Rover Public - Station/Operations/Admin/Training FacilityProject adjusted to shift $160,000 (federal) from FY 2011 CONST to FY 2012 CAPITALIZATION. The total project cost remains the same. Capitalized maintenance costs IN FY 2012 are from the the 2009 5307 grant.7/13/2011
2011-0012011-45-1145307 Urban capital Funding for Rover Public - Station/Operations/Admin/Training FacilityInclude capitalized maintenance in project description and shift $275,000 total funds for that work phase3/09/2011
2011-0152011-51-108SR-109Project adjusted to change the fiscal year for PE-D from 2011 to 2013.6/09/2011
2011-0382011-57-024Long Hollow Pike Traffic Signal SynchronizationThis modification updates the FY and amounts for the PE NEPA, PE Final Design and Construction phases. The total project cost remained the same.12/28/2011
2013-0302011-57-024Long Hollow Pike Traffic Signal SynchronizationProject modified to shift funds between phases to reflect update cost estimates including CEI costs. The total project cost remains the same. 5/31/2013
2013-0312011-57-026Madison Creek/Long Hollow Pike Traffic SignalProject modified to shift funds between phases to reflect update cost estimates including CEI costs. The total project cost remains the same. 5/31/2013
2011-0402011-57-026Madison Creek/Long Hollow Pike Traffic SignalThis modification updates the FY and amounts for the PE NEPA, PE Final Design and Construction phases. The total project cost remained the same.12/28/2011
2012-0142011-62-110I-65Project modified to add $3,712,500 (federal) to FY 2013.5/03/2012
2013-0212011-62-110I-65Project modified to change the funding source for fiscal year 2013 from IM to NHPP to reflect new codes part of the MAP-21 transportation bill. Additionally, $6,453,000 (federal share) are being added to the project..3/08/2013
2013-0452011-62-110I-65Project modified to reduce funds by $4,500,000 (federal share)8/29/2013
2013-0462011-64-111I-65 InterchangeProject modified to reduce funds by $9,000,000 (federal share).8/29/2013
2013-0222011-64-111I-65 InterchangeProject modified to change the funding source for fiscal year 2013 from IM to NHPP to reflect new codes part of the MAP-21 transportation bill. Additionally, $7,425,000 (federal share) are being added to the project..3/08/2013
2013-0322011-69-122Clean Air Schools Anti-Idling Campaign and School Pooling ProgramProject is being modified to change the funding split for FY 2013 from 100% Federal to 80% Federal and 20% Local in response to MAP-21 requirements. The total project cost remains the same.6/04/2013
2013-0332011-69-123Transportation-Related Air Quality Education ProgrammingProject modified to change the funding split for FY 2013 from 100% Federal to 80% Federal and 20% Local in response to MAP-21 requirements. The total project cost remains the same.6/04/2013
2013-0342011-69-124Transportation-Related Air Quality Outreach CampaignProject modified to change the funding split for FY 2013 from 100% Federal to 80% Federal and 20% Local in response to MAP-21 requirements. The total project cost remains the same.6/04/2013
2011-0092011-72-012SR-141Project adjusted to add $1,104,000 (federal) to ROW in FY 2011.5/23/2011
2011-0322011-72-107I-40Project adjusted to add $7,330,050 (federal) to PE-D in FY 2011 and reduce CONST by $5,709,150 (federal) in FY 2011.9/14/2011
2013-024AM-018SR-109Project modified to change the funding source from NHS to NHPP to reflect new codes part of the MAP-21 transportation bill. The total project cost remains the same.4/01/2013
2011-0312011-62-161SR-397Project adjusted to add $6,535,200 (federal) to FY 20118/18/2011
2011-0202011-62-161SR-397Project adjusted to change the fiscal year for construction from 2012 to 2011. The total project cost remains the same.7/14/2011
2011-0412011-79-162Hartmann Drive LightingThis modification adds PE NEPA phase, and updates FY and amounts for the PE Final Design and Construction phases. The total project cost remained the same.12/30/2011
2012-0102011-87-163Nashville Smartway Remote Travel Time Assessment for SR-840Project was modified to add a total of $240,000 in Interstate Maintenance funds in FY 2012.3/27/2012
2012-0152011-610-165Fairview 3R Improvement Projects GroupingProject modified to shift $3,200 (federal) from PE-D to PE-N in FY 2012. The total project cost remained the same.5/04/2012
2012-0072012-56-171Sanders Ferry/ Drakes Creek Bike TrailProject modified to subdivide the PE phase to include PE-NEPA in FY2012 by shifting $96,000 (federal) from PE Design. The total project cost remains the same.1/24/2012
2012-0342012-44-172Sam Ridley Pkwy & Stonecrest Pkwy Intersection ImprovementsProject modified break down the PE & ROW phase into PE-NEPA, PE-Final Design and Right-of-Way. The total project cost remains the same. 11/29/2012
2013-0392012-47-173Smyrna Signal SystemProject modified to shift $16,000 (federal share) to fund PE-NEPA. The total amount of funds programmed remains the same. 8/08/2013
2012-0222012-26-188Spring Station Drive Multi-use TrailProject modified to add ROW to the work description. No changes to funding were made as part of this modification.7/10/2012
2013-0082012-87-192I-24 Smartway ExpansionProject modified to change the funding source from IM to NHPP to reflect new codes part of the MAP-21 transportation bill. No changes to the funding amounts are taking place and the total project cost remains the same.2/19/2013
2013-0472012-56-195Highway 31W/ SR-41 Bike/Pedestrian ProjectProject modified to shift funds from PE NEPA to PE Design ($17,440 federal) and to Construction ($13,250 federal). The total project cost remains the same.12/02/2013
2012-0312012-56-195Highway 31W/ SR-41 Bike/Pedestrian ProjectThe modifications adds Preliminary Engineering NEPA phase by shifting $51,200 (federal share) from to PE-Design. The total project cost remains the same.9/17/2012
2013-0432012-44-201SR-1 and SR-96 Intersection Grade SeparationProject modified to increase total funding by $4,950,000 and change the funding source to National Highway Performance Program (NHPP)8/29/2013
2013-0232012-44-201SR-1 and SR-96 Intersection Grade SeparationProject modified to change the funding source from NHS to ACNHPP (Advance Construction) to reflect new codes part of the MAP-21 transportation bill. The total project cost remains the same.4/01/2013